Laserfiche WebLink
3rgir- 001 <br /> t 7A11111111111. <br /> ENGINEERING TECHNOLOGIES. INC <br /> JUDD &BLACK APPLIANCE STORE <br /> TEMPORARY WALL BRACING <br /> 3001 Hewett Avenue <br /> Everett, Washington <br /> Job No.: 18266.00 <br /> Calculations to brace the existing brick masonry and concrete masonry unit walls <br /> after a fire occurred to the Judd&Black Appliance Store. Design is in accordance <br /> with the 2015 International Building Code and the 2015 International Existing <br /> Building Code. <br /> Bracing will be installed in two phases. Phase I will be installed on the exterior face <br /> of the walls where stability bracing is required. Phase II bracing will be installed on <br /> the inside face of the wall as the debris is cleared from the 2m floor. <br /> Phase I is intended to prevent the exterior walls form collapsing onto the sidewalk <br /> and street. Phase II bracing is intended to provide stability of the exterior and <br /> interior to allow content evaluation and removal on the lower level. <br /> rV.:' :1 A4 <br /> \w Vi/ <br /> lr <br /> r 28885 <br /> 0141 <br /> `SOMAL <br /> ffS^; <br />