Laserfiche WebLink
12/30/2019 City of Everett Page <br /> 2:13:27PM <br /> ._ 1Th <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C 1711-002 Site Address 1919 HIGHLAND AVE <br /> Applied 11/6/2017 Applicant Lot <br /> Approved 12/13/2017 Owner JOHNSON LACIE T&BICKLEY NATHANIEL G Block <br /> Issued 12/14/2017 Contractor OWNER Tract <br /> Parent Permit No. W1807-004 Description NEW DADU <br /> Notes **R403.7.1 WSEC;INVERTER-DRIVEN DUCTLESS MINI-SPLIT HEAT PUMP REQUIRED IN THE <br /> DWELLING AT LIVING RM/KITCHEN; <br /> **3PARKING STALLS TO BE PAVED; <br /> **SIDING/MATERIAL TO MATCH MAIN RESIDENCE <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 1/9/2018 1/9/2018 BLDG KMK CORRECTION Need approved drawings and site plan <br /> FOUNDATION Note:Need UFER ground(20'#4) <br /> 1/9/2018 1/9/2018 BLDG KMK CORRECTION Need approved drawings and site plan <br /> FOOTING/SETBAC Note:Need UFER ground(20'#4) <br /> 1/10/2018 1/10/2018 BLDG UFER KMK CORRECTION 9:45a Missing <br /> GROUND UFER.Call when <br /> ready <br /> 1/10/2018 1/10/2018 BLDG KMK CORRECTION 9:45a Missing HDs. <br /> FOOTING/SETBAC Call when ready <br /> 1/10/2018 1/10/2018 BLDG UFER KMK APPROVAL <br /> GROUND <br /> 1/10/2018 1/10/2018 BLDG KMK APPROVAL As noted Be sure interior footings are 18"x 18"and <br /> FOOTING/SETBAC to bearing. <br /> 2/20/2018 2/20/2018 BLDG TMB APPROVAL OK for siding <br /> 07-EXTERIOR <br /> 3/13/2018 3/13/2018 PLUMB 05-OTHER SDP APPROVAL Water service-OK <br /> to cover <br /> 3/13/2018 3/13/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 3/13/2018 3/13/2018 MECH 04-ROUGH SDP APPROVAL OK as noted OK as noted: <br /> IN 1)complete stove exhaust using smooth <br /> metal duct 7"rd.insulate exhaust to r-4 min <br /> 3/13/2018 3/13/2018 GAS 01-ROUGH IN SDP APPROVAL OK tested at 20 PSI- <br /> OK for service <br /> 3/20/2018 3/20/2018 BLDG DWF PARTIAL APPR *Strap cut out over 50%top plates(2 <br /> 08-FRAMING locations). <br /> *Crawl space access 18"x24"IRC. <br /> *OK to insulate. <br /> Will inspect above on insulation inspection. <br /> 3/21/2018 3/21/2018 BLDG DWF APPROVAL <br /> 11-INSULATION <br /> 3/21/2018 3/21/2018 BLDG DWF APPROVAL <br /> 11-INSULATION <br /> 3/21/2018 3/21/2018 BLDG DWF APPROVAL <br /> 08-FRAMING <br /> 10/8/2018 10/8/2018 PERMIT CHA APPROVAL extension to <br /> EXTENSION 04/06/2019 <br /> 10/10/2018 10/10/2018 PLUMB 06-FINAL SDP CORRECTION No access <br /> 10/10/2018 10/10/2018 MECH 06-FINAL SDP CORRECTION Ni access <br /> 10/10/2018 10/10/2018 PLUMB 06-FINAL SDP CORRECTION No access <br /> 10/10/2018 10/10/2018 BLDG 14-FINAL DWF CORRECTION Not ready for inspection <br /> Need elect,mech,plumb,PW finals <br /> Attic/crawl-air seal-gasket <br /> #2 stairways to IRC <br /> Handrailing,step. <br /> Not complete list <br /> 10/10/2018 10/10/2018 MECH 06-FINAL SDP CORRECTION No access <br /> INSP12 CTS <br />