My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/06/10 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/06/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 10:18:15 AM
Creation date
6/17/2020 10:13:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EEVERETTv' <br /> An Ordinance creating a special improvement project entitled "Sewer"0" Utility Upgrades" <br /> Project title: Fund 336, Program 013. <br /> City Council Agenda Item Cover Sheet <br /> Council Bill# Consideration: Plans&Systems Ordinance <br /> C2bCS'-4 Project: Sewer"0"Utility Upgrades <br /> Agenda dates requested: Partner/Supplier: <br /> May 27,2020 Location: South of Pacific Avenue,North of 415t Street <br /> Briefing Preceding action: Call for Bids 3/11/20 <br /> Proposed action Fund: 336 <br /> Consent <br /> ,Action <br /> Ordinance Fiscal summary statement: <br /> Public hearing <br /> Yes X No The budget for this project is$6,000,000 and the source of funds will be Fund 401— <br /> "' Water and Sewer Utility Fund. <br /> Budget amendment: <br /> Yes -X No <br /> PowerPoint presentation: <br /> Yes X No <br /> Attachments: <br /> Proposed Ordinance,Map Project summary statement: <br /> Department(s)involved: Sewer"0" Utility Upgrades project will replace and upsize existing sewers to address <br /> Public Works,Admin pipe condition and capacity issues. The existing sewer mains are over 100 years old. <br /> Existing drainage structures in the right-of way will be replaced andrreconnected to the <br /> Contact person: new main. Cast iron water mains installed in 1958 are prone to breaks and will be <br /> Arnie Roshak replaced on Colby Ave between 37th and 40th. Street illumination direct bury wiring <br /> Phone number: and telemetry conduit will be replaced. Restoration will include trench patch, half width <br /> 425-257-7249 street pavement overlay of the east side of Colby Ave.,ADA curb ramp upgrades at <br /> intersections and replacement of sidewalk on both sides of the street. Alleys will be <br /> Email: repaved full width after trenches are backfilled. <br /> aroshak@everettwa.gov <br /> Recommendation(exact action requested of Council): <br /> Initialed by: <br /> '/�1 <br /> Adopt an Ordinance creating a special improvement project entitled "Sewer"0" Utility <br /> Upgrades" Fund 336, Program 013. <br /> Department head <br /> Administration <br /> Council President <br /> 177 <br />
The URL can be used to link to this page
Your browser does not support the video tag.