My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3323 HOYT AVE WHOLE SITE 2020-06-17
>
Address Records
>
HOYT AVE
>
3323
>
WHOLE SITE
>
3323 HOYT AVE WHOLE SITE 2020-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 11:50:18 AM
Creation date
6/17/2020 11:49:12 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
3323
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICS/ORKS PERMIT opateApplied: 3/19/2018 <br /> City of Everett Permit Services0010.11. Public Works Permit#: PW1803-054 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> 101111 <br /> (425)257-8810 Public Works Fee: $160 <br /> 1 6 ill. ''018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ALI ADNAN LEADING EDGE CONSTRUCTION LLC <br /> 16511 41ST PL W 1777 S BURLINGTON BLVD#513 <br /> LYNNWOOD, WA, 98037 BURLINGTON,WA, 98233 <br /> PHONE: PHONE: 4258700350 <br /> TAX PARCEL ID#: 00436979001000 SITE ADDRESS: 3323 HOYT AVE <br /> DESCRIPTION: SITE WORK FOR 2 NEW DUPLEX'S <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and with <br /> other inspection requests. <br /> 5. Install erosion control measures per City of Everett Standards for small parcels and remove upon completion of the <br /> project prior to final approval of the permit. <br /> 6. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. Repair or replace any <br /> broken or damaged sidewalk at the direction of the Public Works Inspector. <br /> 7. Protect all existing underground utilities during construction. <br /> 8. Install approved backwater valve in the building sanitary sewer system if necessary to comply with UPC 710.1. <br /> 9. Side sewer service shall conform to standard plans 601, 602 &604. <br /> 10. A Landscaping Inspection is required prior to final permit approval by the Public Works Inspector. Please contact the <br /> Planning Department to schedule your landscaping inspection as noted on the approved plans. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $50.00 <br /> Paving (Parking and Walkways) $45.00 <br /> Misc. Minor Permits (Drainage Work) $25.00PW Plan <br /> PW Site Inspection on $20 00 view $20.00JIlL 1 6 2018 1 i <br /> CI Ty <br /> PerMit e gi n, t . <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> C �� / harmless the City of Everett from any and all claims for damages,costs, <br /> _ X.rteexpenses,or causes of action that may arise because of installation and <br /> '70/4 maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construct Iry Public ',orks) Da for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date ^ 11 <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.