Laserfiche WebLink
BLOWER DOOR TEST RESULTS <br /> JBDT <br /> Date of Test: <br /> Blower Door Testing NW <br /> 1111 <br /> 425-312-3914 •BlowerDoorNW.com Technician Name: / • -- 110.. 1 <br /> blowerdoorschedule@gmail.comit., -0 y <br /> Job Site Information <br /> iV <br /> 11'9- <br /> Permit#: <br /> Address and Lot Number: �L0Zb ���--lea' �1t� f1U�-S�e <br /> City: v Zip Code: <br /> Cond.Floor Area(ft2): . Age of House: <br /> Source(check one): rlans ❑Estimated ❑Measured <br /> Test Results <br /> Pass ❑Fail ❑Could Not Complete (4- Volume <br /> Lk.`—k ACH5o <br /> m <br /> Test Target ‘42---c\ CFM@5OPa <br /> Ring(check one if applicable): ❑ Open ❑ C <br /> Blower Door Fan Location: Apt 0 Weather Conditions: <br /> Results shall be reported as Air Changes per Hour at 50 Pascals(ACH50)and shall be calculated as follows: <br /> ACH50=(CFM50 x 60)/Volume <br /> Where: <br /> CFM50=Blower door fan flow at 50 Pascal pressure difference <br /> Volume=Conditioned Floor Area of the housing unit x ceiling height <br /> 2015 Washington State Energy Code reference: <br /> R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour.Testing shall be conducted with a blower <br /> door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A written report of the results of the test shall <br /> be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.Once <br /> visual inspection has confirmed sealing(see Table R402.4.1.1),operable windows and doors manufactured by small business shall be permitted to be sealed off at the frame prior to the test. <br /> During testing: <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures; <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open,access hatches to conditioned crawl spaces and conditioned attics shall be open; <br /> 4.Exterior openings for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. <br />