Laserfiche WebLink
1/8/2020 Page <br /> City of Everett � <br /> 12:42:32PM ' <br /> - INSPECTION ACTIVITY REPORT <br /> Permit No. C1804-004 Site Address 1722 MAPLE ST <br /> Applied 4/9/2018 Applicant FARNSWORTH ZEKE Lot <br /> Approved 6/4/2018 Owner SCHUBERT PAUL J Block <br /> Issued 6/13/2018 Contractor CASCADE BUILDERS NW INC Tract <br /> Parent Permit No. Description ADDITION TO EXTEND DINING ROOM,UTILITY ROOM&B <br /> Notes PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 7/16/2018 7/17/2018 BLDG KMK APPROVAL Provide ventilation 7/15/2018 8:05 PM Cecil Farnsworth <br /> 02-FOOTING/SETB for undefloor space Footing&stem wall mono pour <br /> Contact Name:Cecil Farnsworth <br /> Site Address:1722 MAPLE ST <br /> Phone:4252315277 <br /> e-Mail:zekefarnsworth@aol.com <br /> 8/2/2018 8/2/2018 BLDG DWF APPROVAL As noted Contractor to install 1/4"x 3"Simpson <br /> 05-UNDERFLOOR Strong-Drive screws as per ledger detail, <br /> page 3 of 4. <br /> Then OK to cover. <br /> 8/28/2018 8/28/2018 BLDG 04-UFER KMK APPROVAL *See note <br /> GROUND UFER installed per plan. <br /> 9/27/2018, 9/27/2018 BLDG DWF CORRECTION Need approved set <br /> 07-EXTERIOR on plans for <br /> inspectio <br /> 9/28/2018 9/28/2018 BLDG DWF CORRECTION Need approved plans <br /> 07-EXTERIOR on site <br /> 10/12/2018 10/12/2018 BLDG DWF APPROVAL OK to cover <br /> 07-EXTERIOR <br /> 10/12/2018 10/12/2018 PLUMB SDP APPROVAL See notes Shower/tub valve is on back order- <br /> 03-ROUGH IN plumber will install. <br /> 10/30/2018 10/30/2018 BLDG DWF PARTIAL APPR Need mechanical rough in-Do not cover <br /> 08-FRAMING ceiling. <br /> Trusses need to have H+1 clips and 45 <br /> degree gable end brace as per plans. <br /> OK to insulate. <br /> Will inspect above correction on insulation <br /> inspection. <br /> 10/31/2018 10/31/2018 MECH 06-FINAL SDP APPROVAL See notes Dryer,bath,laudray exhausts OK final. <br /> Note:Don't forget the plumbing vent <br /> through the roof. <br /> 11/6/2018 11/6/2018 BLDG DWF APPROVAL <br /> 08-FRAMING <br /> 11/6/2018 11/6/2018 BLDG DWF APPROVAL As noted Provide insulation certification at final. <br /> 11-INSULATION <br /> 11/6/2018 11/6/2018 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 11/14/2018 11/14/2018 BLDG KMK APPROVAL <br /> 09-DRYWALL <br /> 5/1/2019 5/1/2019 BLDG 15-FINAL DWF NOT READY Need pluming and electrical final. <br /> Bldg-correction install hardwire smoke <br /> alarm in bedroom. <br /> Provide a certificate of insulation letter at <br /> final. <br /> INSP12 CRWsysTEms <br />