Laserfiche WebLink
12/6/2019 City of Everett Page <br /> 1:53:21PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1811-033 Site Address 2505 PANAVIEW BLVD <br /> Applied 11/21/2018 Applicant Lot <br /> Approved 1/28/2019 Owner BEYENE ALMAZ&AWOKE SOLOMON K Block <br /> Issued 1/30/2019 Contractor OWNER Tract <br /> Parent Permit No. Description SFR ADDITION,REMODEL,FOR NEW AFH <br /> Notes (12/3/2018 1:17 PM TRN) <br /> PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 3/20/2019 3/20/2019 BLDG DWF APPROVAL as noted contractor install verts at 24"as per plans <br /> 02-FOOTING/SETB and epoxy inserted rebar inton existing <br /> foundation,then ok to cover. <br /> 4/8/2019 4/8/2019 BLDG KMK APPROVAL (4/8/2019 2:48 PM KMK) <br /> 07-EXTERIOR KMK changed Inspection Type from BLDG <br /> 09-DRYWALL NAILING to BLDG <br /> 07-EXTERIOR SHEAR <br /> 4/8/2019 4/8/2019 BLDG KMK APPROVAL <br /> 06-UNDERSLAB <br /> 5/14/2019 5/14/2019 BLDG KMK APPROVAL (5/13/2019 9:38 AM KMK) <br /> 08-FRAMING KMK changed Inspection Date/Time from <br /> 05/13/2019 to 05/14/2019 <br /> Phone:425-918-0396 <br /> 5/20/2019 5/20/2019 BLDG KMK APPROVAL Call for access <br /> 11-INSULATION Phone:425-918-0396 <br /> 6/3/2019 6/3/2019 BLDG KMK APPROVAL Jay Garcia 425-918-0396 <br /> 09-DRYWALL Requested call prior to inspection <br /> 8/30/2019 8/30/2019 BLDG 15-FINAL KMK APPRVD-PERK <br /> 8/30/2019 8/30/2019 ADMIN USE AKH APPROVAL <br /> ONLY** <br /> INSP12 CRWy r M <br />