Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 1.0 Introduction <br /> This Stormwater Pollution Prevention Plan (SWPPP) has been prepared in accordance with the <br /> National Pollutant Discharge Elimination System (NPDES) stormwater permit requirements for <br /> the proposed site grading for Delta Tidelands, LLC. The project is a portion of the Everett <br /> Riverfront Redevelopment. It is located north of 36th St. and east of Interstate 5, Everett, <br /> Washington 98201 within a portion of Section 29, Township 29 North, Range 5 East, WM. The <br /> project site is currently zoned as W-C (Waterfront Commercial) and is comprised of the <br /> following tax parcels: 00576000200000, 00576000200001, and 29052900102300. <br /> The site is bounded on the south by 36th Street, on the west by parcel 29052900401000,the north <br /> by the Burlington Northern Santa Fe Railroad, and to the east by parcels 29052900103200 and <br /> 00576000200002.The abutting properties are undeveloped. <br /> Delta Tidelands is proposing to grade and place fill material within the three parcels.The total <br /> area of the site is 3.9 acres. Approximately 2.5 acres will be affected by the fill and grading <br /> activity. <br /> Construction activities will include grading and placing fill on the site. The fill material will be <br /> brought in from off-site. <br /> The purpose of this SWPPP is to describe the proposed construction activities and all temporary <br /> and permanent erosion and sediment control (TESC) measures, pollution prevention measures, <br /> inspection/monitoring activities, and recordkeeping that will be implemented during the <br /> proposed construction projects. The objectives of the SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs)to prevent erosion and sedimentation, <br /> and to identify, reduce, eliminate or prevent stormwater contamination and water <br /> pollution from construction activity. <br /> 2. Prevent violations of surface water quality, ground water quality, or sediment <br /> management standards. <br /> 3. Prevent, during the construction phase, adverse water quality impacts including impacts <br /> on beneficial uses of the receiving water by controlling peak flow rates and volumes of <br /> stormwater runoff at the Permittee's outfalls and downstream of the outfalls. <br /> This SWPPP was prepared using the Ecology SWPPP Template downloaded from the Ecology <br /> website. It is based on the requirements set forth in the Construction Stormwater General Permit <br /> and the Stormwater Management Manual for Western Washington(SWMMWW 2012). The <br /> report is divided into seven main sections with several appendices that include stormwater <br /> related reference materials. The topics presented in the each of the main sections are: <br /> SWPPP Page 1 <br /> Delta Tidelands—Site Grading June 2016 <br />