My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2915 36TH ST 2020-06-18
>
Address Records
>
36TH ST
>
2915
>
2915 36TH ST 2020-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 10:16:55 AM
Creation date
6/18/2020 10:15:18 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH ST
Street Number
2915
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> Activities where there is 100 percent infiltration of surface water <br /> runoff within the site in approved and installed erosion and sediment <br /> control facilities. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to assure <br /> continued performance of their intended function. Site inspections shall be <br /> conducted by a person who is knowledgeable in the principles and practices <br /> of erosion and sediment control at least once every calendar week and within <br /> 24 hours of any major rainfall event. This person has the necessary skills to: <br /> > Assess the site conditions and construction activities that could impact <br /> the quality of stormwater, and <br /> > Assess the effectiveness of erosion and sediment control measures used <br /> to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on-call at <br /> all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified in <br /> this SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> • This SWPPP shall be retained near the construction activities or within <br /> reasonable access. <br /> • The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or <br /> could have, a significant effect on the discharge of pollutants to waters of the <br /> state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state regulatory <br /> authority, it is determined that the SWPPP is ineffective in eliminating or <br /> significantly minimizing pollutants in stormwater discharges from the site. <br /> The SWPPP shall be modified as necessary to include additional or modified <br /> BMPs designed to correct problems identified. Revisions to the SWPPP <br /> shall be completed within seven(7)days following the inspection. <br /> SWPPP Page 8 <br /> Delta Tidelands—Site Grading June 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.