Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 4.0 Construction Phasing and BMP Implementation <br /> The BMP implementation schedule is driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> BMP implementation schedule. The list contains key milestones such as wet season <br /> construction.All construction dates given are approximate. Contractor will insert a detailed <br /> schedule when available. <br /> BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project,and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The project site is located west of the Cascade Mountain Crest. As such,the dry <br /> season is considered to be from May 1 to September 30 and the wet season is considered to be <br /> from October 1 to April 30. <br /> • Estimate of Construction start date: July 2016 . <br /> • Estimate of Construction finish date: October 2016 <br /> • Mobilize equipment on site: TBD <br /> • Mobilize and store all ESC and soil stabilization products TBD <br /> • Install ESC and BMP measures: TBD <br /> • Wet Season starts: October 1, 2016 <br /> SWPPP Page 10 <br /> Delta Tidelands—Site Grading June 2016 <br />