My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2915 36TH ST 2020-06-18
>
Address Records
>
36TH ST
>
2915
>
2915 36TH ST 2020-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 10:16:55 AM
Creation date
6/18/2020 10:15:18 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH ST
Street Number
2915
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Transfer of Coverage Form <br /> The Permittee can transfer current coverage under this permit to one or more new <br /> operators,including operators of sites within a Common Plan of Development, <br /> provided the Permittee submits a Transfer of Coverage Form in accordance with <br /> General Condition G9. Transfers do not require public notice. <br /> B. Public Notice <br /> For new or previously unpermitted construction activities,the applicant must publish a <br /> public notice at least one time each week for two consecutive weeks, at least 7 days <br /> apart,in a newspaper with general circulation in the county where the construction is to <br /> take place.The notice must contain: <br /> 1. A statement that"The applicant is seeking coverage under the Washington State <br /> Department of Ecology's Construction Stormwater NPDES and State Waste <br /> Discharge General Permit". <br /> 2. The name,address and location of the construction site. <br /> 3. The name and address of the applicant. <br /> 4. The type of construction activity that will result in a discharge(for example, <br /> residential construction,commercial construction, etc.),and the number of acres to <br /> be disturbed. <br /> 5. The name of the receiving water(s) (that is,the surface water(s)to which the site <br /> will discharge),or, if the discharge is through a storm sewer system,the name of <br /> the operator of the system. <br /> 6. The statement: "Any persons desiring to present their views to the Washington <br /> State Department of Ecology regarding this application, or interested in Ecology's <br /> action on this application,may notify Ecology in writing no later than 30 days of <br /> the last date of publication of this notice. Ecology reviews public comments and <br /> considers whether discharges from this project would cause a measurable change in <br /> receiving water quality,and,if so,whether the project is necessary and in the <br /> overriding public interest according to Tier II antidegradation requirements under <br /> WAC 173-201A-320.Comments can be submitted to: Department of Ecology, <br /> PO Box 47696,Olympia,Washington 98504-7696 Attn: Water Quality Program, <br /> Construction Stormwater." <br /> Construction Stormwater General Permit <br /> Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.