Laserfiche WebLink
i. The name, title, and signature of the person conducting the site inspection, a <br /> phone number or other reliable method to reach this person, and the following <br /> statement: "1 certify that this report is true, accurate, and complete to the best of <br /> my knowledge and belief." <br /> Table 3: Summary of Primary Monitoring Requirements <br /> Size of Soil Weekly Site Weekly Weekly Weekly pH CESCL <br /> Disturbance' Inspections Sampling w/ Sampling w/ Sampling2 Required for <br /> Turbidity Transparency Inspections? <br /> Meter Tube <br /> Sites that disturb Required Not Required Not Required Not Required No <br /> less than 1 acre, but <br /> are part of a larger <br /> Common Plan of <br /> Development <br /> Sites that disturb 1 Required Sampling Required— Required Yes <br /> acre or more, but either method3 <br /> fewer than 5 acres <br /> Sites that disturb 5 Required Required Not Required4 Required Yes <br /> acres or more <br /> Soil disturbance is calculated by adding together all areas that will be affected by construction activity. <br /> Construction activity means clearing,grading,excavation,and any other activity that disturbs the surface of the <br /> land, including ingress/egress from the site. <br /> 2 If construction activity results in the disturbance of 1 acre or more,and involves significant concrete work(1,000 <br /> cubic yards of poured over the life of a project)or the use of recycled concrete or engineered soils(soil amendments <br /> including but not limited to Portland cement-treated base[CTB],cement kiln dust[CKD], or fly ash),and <br /> stormwater from the affected area drains to surface waters of the State or to a storm sewer stormwater collection <br /> system that drains to other surface waters of the State,the Permittee must conduct pH sampling in accordance with <br /> Special Condition S4.D. <br /> Sites with one or more acres, but fewer than 5 acres of soil disturbance, must conduct turbidity or transparency <br /> sampling in accordance with Special Condition S4.C. <br /> 4 Sites equal to or greater than 5 acres of soil disturbance must conduct turbidity sampling using a turbidity meter in <br /> accordance with Special Condition S4.C. <br /> Construction Stormwater General Permit <br /> Page 15 <br />