Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> For <br /> C.J. Ebert <br /> 2911 YZ Hewitt Ave. <br /> Everett, WA 98201 <br /> 425-258-9366 <br /> Owner/Developer <br /> Delta Tidelands, LLC <br /> 701 Fifth Avenue <br /> Suite 3600 <br /> Mukilteo, WA 98275 <br /> Contractor <br /> KLB Construction <br /> PO Box 158 <br /> Mukilteo, WA 98275 <br /> 425-355-7335 <br /> Project Site Location <br /> 2915 36th St. <br /> Everett, WA 98201 <br /> Certified Erosion and Sediment Control Lead <br /> Nicki Spry <br /> nickis@klbconstruction.com <br /> 425-355-7335 <br /> SWPPP Prepared By <br /> David Evans and Associates, Inc. <br /> Brett Nicholson, E.I.T <br /> 1620 W Marine View Drive, Suite 200 <br /> Everett, WA 98201 <br /> 425-259-4099 <br /> SWPPP Preparation Date <br /> June 2016 <br /> Approximate Project Construction Dates <br /> July 2016—October 2016 <br />