Laserfiche WebLink
PUBLIC mORKS PERMIT jjpateApplied: 2/16/2018 <br /> City of Everett Public Works Department <br /> Public Works Permit#: PW1802-018 <br /> 3200 Cedar Street Parent Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> '' • (425) 257-8810 Public Works Fee: $130.00 <br /> rn 2 MAR Lu ►d <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SAUNDERS LLP HANDY ANDY RENT-A-TOOL <br /> 16218 121ST AVE NE 10711 AURORA AVE N <br /> BOTHELL, WA, 98011 SEATTLE, WA, 98133 <br /> PHONE: 2063726662 PHONE: 2063722482 <br /> TAX PARCEL ID#: 28041000302600 SITE ADDRESS: 7911 40TH AVE W <br /> DESCRIPTION: IMPERVIOUS SURFACE, LANDSCAPING, FENCE <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 2/23/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> 10. Install driveway apron per City Design and Construction Standards and Specifications for Development. Prior to pouring <br /> concrete, an inspection must be scheduled to evaluate the formwork. The inspector must also evaluate the base course <br /> prior to asphalt paving of the parking lot. <br /> 11. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Contact the <br /> Planning Department(Teresa Weldon) at 425-257-7281 or tweldon@everettwa.gov to schedule the inspection. <br /> 12. This permit must be finaled in order to close out this permit. Call the inspection line to request a Final for this permit <br /> when all items have been completed. 425-257-8881. z 8 <br /> , <br /> Public Works Permit Fee Breakdown: L I <br /> Paving (1965sf) $45.00 M ,� r <br /> Driveway Apron $45.00 h Q W3 I Li MAR 0 2 2018 -J <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 0 VERETT CITY p�EVERETT <br /> T <br /> Perri ll Services Permit Services <br /> City of Everett Oficial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> .0^4dAlAit <br /> 041/1A r�3/Z �, expenses,or causes of action that may arise because of installation and <br /> �C- maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Constr ction (Public Works) ate for and further agrees to remove s. e upon notice from the City and to <br /> replace ... pro rty dam gellereby. <br /> FINAL INSPECTION Date 3 ,� <br /> Approved as Constructed (PW Inspector) =igfrature of pplica Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> 0i et <br />