Laserfiche WebLink
Central Park SFR-CAR &Mitigation Plan <br /> otherwise provided in this EMC 40.050,a performance security shall remain in effect until final <br /> inspection and construction acceptance by the City of all facilities specified by the plans, including those <br /> improvements whose construction is secured with the performance security. <br /> Table 3:Project maintenance and performance monitoring bonding cost estimate* <br /> City of Everett Assurance Device Worksheet <br /> Trees ($15.00) * 30 $450.00 <br /> 1 gal shrubs ($9.75) *90 $877.50 <br /> Plants Subtotal $1,327.50 <br /> Installation $633.75 <br /> Monitoring 20.0 hrs*$85 $1,700.00 <br /> Maintenance $1,500.00 <br /> Subtotal $5,161.25 <br /> Performance security Subtotal*300% $15,483.75 <br /> *Quantities and prices included above are a conceptual estimate for bonding purposes,and do not <br /> constitute a firm bid or offer to perform services. <br /> 8.0 Conclusions <br /> Wetland Solutions, Inc. has completed the site investigation and critical areas assessment for the subject <br /> property. One Category 3 wetland requiring a 75-foot buffer and no streams were located on the <br /> subject site. The proposed project includes the construction of a new single family home that will result <br /> in the permanent impact of 1,670 SF buffer area, 303 SF of temporary buffer impact, and 391 SF of <br /> temporary wetland impact. Mitigation measures include the restoration of all temporarily impacted <br /> area and enhancement of the remaining buffer area. The mitigation should result in a net increase in <br /> local functions and values. <br /> This critical area study should be considered subject to change until reviewed and approved by the <br /> appropriate regulatory agencies with jurisdiction. <br /> ) <br /> ii <br /> ii <br /> 5cpir'i'll:!rl <br /> '7 illi P 1j I,? <br /> �.• VA'!•, <br /> _,..�3ii'c1i;y. i. irkJ`:(.!`-Dti)rl. !fi!. <br />