Laserfiche WebLink
7/3/2019 Page <br /> City of Everett <br /> 8:35:17AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. EW1808-008 Site Address 1011 93RD ST SW <br /> Applied 8/28/2018 Applicant Lot <br /> Approved 8/28/2018 Owner KEM VANNARA&CHUN REY Block <br /> Issued 8/28/2018 Contractor OWNER Tract <br /> Parent Permit No. BW 1705-001 Description RUN NEW WIRE TO PORCH LIVING SPACE,INCLUDES SERA <br /> Notes AND ALTERED CIRCUITS <br /> ISSUANCE OF THIS PERMIT APPROVED BY TB. <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 8/29/2018 8/29/2018 ELEC 05-SERVICE SKB CORRECTION Install main bonding jumper and water <br /> grounding electrode conductor. <br /> Finish wiring all circuits prior to inspection. <br /> Install all over current devices including <br /> AFCI protection. <br /> Make up all grounds prior to inspection. <br /> 8/29/2018 8/29/2018 ELEC 03-ROUGH SKB CORRECTION Install main bonding jumper and water <br /> IN grounding electrode conductor. <br /> Finish wiring all circuits prior to inspection. <br /> Install all over current devices including <br /> AFCI protection. <br /> Make up all grounds prior to inspection. <br /> 9/11/2018 9/11/2018 ELEC 05-SERVICE SKB CORRECTION No access 1:07pm <br /> 9/11/2018 9/11/2018 ELEC 03-ROUGH SKB CORRECTION No access 1:07pm <br /> IN <br /> 9/12/2018 9/12/2018 ELEC 05-SERVICE MCB CORRECTION Make up all ground.Only 1 grounding <br /> electrode conductor per lug.Properly install <br /> main bonding jumper.Install all over <br /> current devices.Bathroom receptacle to be <br /> dedicated rough in all circuits(where are <br /> the kitchen circuits etc).Add a kitchen <br /> circuit receptacle on new wall by backdoor. <br /> Not ready. <br /> 9/12/2018 9/12/2018 ELEC 03-ROUGH MCB CORRECTION Make up all ground.Only 1 grounding <br /> IN electrode conductor per lug.Properly install <br /> main bonding jumper.Install all over <br /> current devices.Bathroom receptacle to be <br /> dedicated rough in all circuits(where are <br /> the kitchen circuits etc).Add a kitchen <br /> circuit receptacle on new wall by backdoor. <br /> Not ready. <br /> 9/21/2018 9/21/2018 ELEC 05-SERVICE SKB CORRECTION Prooerly install main bonding jumper#4 or <br /> screw. <br /> Install 2 small appliance circuits for kitchen <br /> Dining room receptacle has to be on a 20 <br /> amp circuit <br /> Add 2nd strap on mast. <br /> 9/21/2018 9/21/2018 ELEC 03-ROUGH SKB CORRECTION Prooerly install main bonding jumper#4 or <br /> IN screw. <br /> Install 2 small appliance circuits for kitchen <br /> Dining room receptacle has to be on a 20 <br /> amp circuit <br /> Add 2nd strap on mast. <br /> 9/26/2018 9/26/2018 ELEC 05-SERVICE SKB CORRECTION Install a proper 2nd strap on mast U-bolt <br /> not 2 holes trap. <br /> Both have to go through 2x4 minumum <br /> framing. <br /> You must have 2 dedicated circuits for <br /> kitchen counter receptacles. <br /> All cables have to enter boxes with proper <br /> fittings. <br /> All junction boxes have to remain <br /> accessible-in wall and attic raise above <br /> insulation. <br /> INSP12 <br /> YSTEMS <br />