Laserfiche WebLink
City of Everett 00 6363 - 2 <br /> 80 Stall Park & Ride Expansion PW 1807 - 018 <br /> Change Order No.1 <br /> Change Order Effective Date: May 13, 2020 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for the <br /> changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract price <br /> shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts.below which the Mayor or <br /> his designee is authorized to direct Contractor to perform additional work. In calculating such <br /> threshold amounts, Washington State sales tax, if applicable to the Work, has been <br /> considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this Change <br /> Order, the work described in Exhibit A, and all work and actual or constructive changes that <br /> occurred or began prior to the date of this Change Order, including, but not limited to, claims <br /> for equitable adjustment of time and compensation, delay, impact, overhead, or <br /> inefficiencies. This provision does not apply to requests for equitable adjustment of time or <br /> price for which the Contractor timely and properly provided notice of a differing site condition, <br /> protest, dispute, claim or Contract Claim as required by the Contract Documents. If the <br /> Contract Documents establish a time period for notice of a differing site condition, protest, <br /> dispute, claim, or Contract Claim that ends after the date of this Change Order, but relates to <br /> work performed prior to the date of this Change Order, then this provision does not apply if <br /> the Contractor timely and properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the extent <br /> explicitly provided herein. <br /> 00 6363 - 2 CHANGE ORDER -AGREED <br />