My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Enterprise Services 6/12/2020
>
Contracts
>
Agreement
>
Interlocal Agreements
>
WA ST Dept of Enterprise Services 6/12/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:19 AM
Creation date
6/22/2020 11:16:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Enterprise Services
Approval Date
6/12/2020
Council Approval Date
5/27/2020
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
ESCO Energy Services McKinstry Audit
Tracking Number
0002346
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. PROJECT CONDITIONS: <br /> The Project Conditions contained in the Master Energy Services Agreement will be used <br /> unless specifically changed herein. The cost effectiveness criteria for this project are per <br /> the McKinstry Essention,LLC proposal dated April 8, 2020. <br /> IV. SCOPE OF WORK: <br /> Per the ESCO proposal dated April 8, 2020, conduct a Detailed Investment Grade Energy <br /> Audit of City of Everett,Exterior and Elevator Upgrades,to identify cost effective energy <br /> conservation measures and present a written Energy Services Proposal, including all <br /> energy audit documentation. The ESCO shall prepare the final Energy Services Proposal, <br /> detailing the actual energy services and ESCO equipment to be provided, energy savings <br /> and cost guarantees, measurement and verification plans, and commissioning plans for the <br /> proposed measures. Measures will include items that save energy, water and other <br /> resources. The Cost Effectiveness Criteria for this project shall be as established in the <br /> Master Energy Services Agreement or as modified in Section III above. <br /> V. SCHEDULE FOR COMPLETION <br /> Final completion of the Energy Audit and Energy Services Proposal within 100 calendar days <br /> after Authorization to Proceed. <br /> 2020763AagrIGAvs <br /> Authorization No. 2020-763 A (1) Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.