Laserfiche WebLink
Mc instry Page 4 <br /> For th ft Of Yon frlfNq <br /> Attachment A: <br /> Investment Grade <br /> Audit Deliverables <br /> The Investment Grade Audit for the City of Everett will include the following elements: <br /> 1. A DESCRIPTION OF THE SYSTEMS WHICH SHALL RECEIVE ESCO EQUIPMENT AND ESCO <br /> SERVICES; <br /> 2. THE COST-EFFECTIVE FACILITY IMPROVEMENT MEASURES(FIMS) TO BE INSTALLED OR <br /> CAUSED TO BE INSTALLED BY THE ESCO(McKinstry)AND A DESCRIPTION OF THE FIMS <br /> ANALYZED BUT DISQUALIFIED UNDER THE COST EFFECTIVENESS CRITERIA; <br /> 3. A DESCRIPTION OF THE SERVICES THAT THE ESCO WILL PERFORM OR CAUSE TO BE <br /> PERFORMED ON OR IN THE INFRASTRUCTURE, INCLUDING BUT NOT LIMITED TO <br /> ENGINEERING, CONSTRUCTION MANAGEMENT, THE OPERATIONS AND MAINTENANCE <br /> PROCEDURES FOR USE ON ESCO EQUIPMENT, TRAINING FOR PERSONNEL, WARRANTY <br /> SERVICE PROVIDED,AND EQUIPMENT MAINTENANCE PROVIDED; <br /> 4. THE MAXIMUM ALLOWABLE PROJECT COST; <br /> 5. RECOMMENDATIONS FOR REPLACEMENT OF EXISTING EQUIPMENT,ALONG WITH <br /> RECOMMENDATIONS FOR IMPROVEMENTS TO EXISTING EQUIPMENT AND OPERATING <br /> CONDITIONS; <br /> 6. THE SERVICE STANDARDS APPROPRIATE FOR THE INFRASTRUCTURE; <br /> 7. THE BASELINE ENERGY CONSUMPTION, INCLUDING THE DATA, METHODOLOGY AND <br /> VARIABLES USED TO COMPUTE THE BASELINE, AND THE BASELINE CALENDAR PERIOD <br /> WHICH SHALL NOT BE LESS THAN TWELVE(12)MONTHS; <br /> 8. THE ESTIMATED ENERGY SAVINGS AND ENERGY COST SAVINGS THAT ARE EXPECTED TO <br /> RESULT FROM THE INSTALLATION OF THE ESCO EQUIPMENT AND FROM THE ESCO <br /> SERVICE,AND AN EXPLANATION OF THE METHOD USED TO MAKE THE ESTIMATE; <br /> 9. THE METHOD BY WHICH ENERGY SAVINGS AND ENERGY COST SAVINGS WILL BE <br /> CALCULATED DURING THE TERM OF THE ENERGY SERVICES AGREEMENT; <br /> 10. A DESCRIPTION OF HOW PROJECT FINANCING(IF REQUIRED) WILL BE COMPLETED; <br /> 11. A DESCRIPTION OF HOW THE ENERGY SAVINGS WILL BE GUARANTEED BY THE ESCO; <br /> 12. A DESCRIPTION OF HOW THE ESCO PROPOSES TO BE COMPENSATED; <br /> 13. THE SCHEDULE FOR PROJECT COMPLETION; <br /> 14. THE NATURE AND EXTENT OF THE WORK AND EQUIPMENT THAT THE ESCO <br /> ANTICIPATES IT WILL RECEIVE FROM OTHER FIRMS UNDER SUBCONTRACT; <br /> 15. DETAILED MEASUREMENT AND VERIFICATION(M&V)PLAN <br /> 5005 Third Avenue South * Seattle,WA* 98124-0567 * 206.762.3311 * Fax 206.762.2624 <br />