My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Apply-A-Line LLC 6/12/2020
>
Contracts
>
Capital Contract
>
Apply-A-Line LLC 6/12/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 1:16:48 PM
Creation date
6/22/2020 1:16:12 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Apply-A-Line LLC
Approval Date
6/12/2020
Department
Public Works
Department Project Manager
Corey Hert
Subject / Project Title
2020 Pavement Markings
Public Works WO Number
PW3679
Tracking Number
0002351
Total Compensation
$113,089.11
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> 142A5988 <br /> Lum <br /> WASHINGTON EVERETT <br /> CITY OF EVERETT, WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this 15th day of May, 2020, by and between the City of <br /> Everett, Washington, a municipal corporation existing under the laws of the State of Washington, <br /> hereinafter called the "City", and Apply-A-Line, a Limited Liability Company hereinafter called the <br /> "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct in a <br /> workmanlike manner the work, improvements, and appurtenances in accordance with the <br /> Specifications and Plans entitled: <br /> 2020 PAVEMENT MARKINGS—VARIOUS CITY LOCATIONS <br /> The following documents ("Contract Documents") are incorporated by reference and are hereby made <br /> a part of this Contract: <br /> A. Invitation for Bid <br /> B. Information for Contractors <br /> C. General and Special Conditions <br /> D. Technical Specifications and Contract Drawings <br /> E. Change Orders (if any) <br /> F. Addenda (if any) <br /> G. Bid Proposal submitted by the Contractor as to those items and/or alternatives <br /> accepted by the City (Conformed copy dated May 7, 2020.) <br /> H. Payment and Performance Bond <br /> All provisions required by law whether here inserted or not <br /> J. Project Plans and Drawings <br /> K. Supplemental Drawings <br /> L. Permits <br /> M. All provisions required by law whether set forth and reproduced herein or not <br /> The work shall be physically complete in all respects within Sixty (60) calendar days from the date of <br /> issuance of the Notice to Proceed. The parties agree the City will suffer damage and be put to <br /> additional expense in the event that the Contractor does not complete the work in all respects and <br /> have it ready for use by the physical completion date stated. <br /> The amount of this contract is One Hundred Thirteen Thousand Eighty-Nine Dollars and Eleven Cents <br /> ($113,089.11) and is based on the bid submitted by the Contractor dated May 7, 2020. <br /> The basis for final payment will be the actual amount of work performed according to the Contract <br /> Documents and payments, whether partial or final, shall be made as specified therein. If, and to the <br /> extent, payment (in whole or in part) is based upon unit prices multiplied by quantities of work actually <br /> performed, the total amount paid to the Contractor may be less than Contract amount stated herein <br />
The URL can be used to link to this page
Your browser does not support the video tag.