Laserfiche WebLink
Project-Water Main Replacement Q Evergreen Way Rebid <br /> Change Order No. 002 <br /> Change Order Effective Date: March 25,2020 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The amount of the change order for the changes described in Exhibit A, represents <br /> complete compensation for the changes described in Exhibit A, including all direct and <br /> indirect costs and impacts.The contract price shall be adjusted as described in this <br /> Change Order. With respect to Washington State sales tax,the amount of the change <br /> order includes such tax unless the box for"exclusive of Wash. State Sales Tax" is <br /> checked on the preceding page. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax, if applicable to the <br /> Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this <br /> Change Order,the work described in Exhibit A,and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to,claims for equitable adjustment of time and compensation,delay, impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute,claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest,dispute,claim,or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Office: 1Tri. <br /> f the CIty,At <br /> David y <br /> M City Cler• City Attorne <br /> Date: Date: Date: ,i.) „?� <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Page 2of4 <br />