My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2532 ROCKEFELLER AVE 2020-06-30
>
Address Records
>
ROCKEFELLER AVE
>
2532
>
2532 ROCKEFELLER AVE 2020-06-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 11:04:32 AM
Creation date
6/30/2020 11:04:16 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2532
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cc: Lance Husby<LHusby@everettwa.gov> <br /> Subject: RE: ROW Permit-Church <br /> Hi Sabrina, <br /> I checked on the main replacements and the water main on Rockefeller between 25th &26th street will be replaced this <br /> year(tentative) so if Jim wanted to wait he could put the retaining wall/rockery just behind the sidewalk after the new <br /> main gets done we would still need a notch for the water meter. <br /> Thanks, <br /> Jim Spooner <br /> M&O Supervisor I Public Works/Water <br /> 425.257.8827 13200 Cedar St, Everett,WA 98201 <br /> everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to <br /> the Public Records Act. <br /> From:Sabrina Fandler<SFandler@everettwa.Rov> <br /> Sent:Thursday,April 18,2019 11:23 AM <br /> To:Jim Coleman<jim@keystoneland.com> <br /> Cc:Jim Spooner<JSpooner@everettwa.gov> <br /> Subject: RE: ROW Permit-Church <br /> Hi Jim, <br /> The water department has located the 3" cast iron water main to be approximately 8" behind the back of sidewalk. If <br /> you line up the face of your wall with the back side of the existing water meter at the sound end,that would provide the <br /> required clearance from the main. If you choose to pursue this route, please provide us with a revised drawing showing <br /> the dimensions from the sidewalk, of the wall, and of the space between the two walls. <br /> Alternatively you can expose the water main, place a 6" ductile iron or schedule 80 welded steel casing over the top of <br /> the pipe, backfill,then you can place the rockery on top as currently shown in your drawing. Please note that any repairs <br /> or work on the main will require the wall to be removed and/or replaced at the owner's expense. In this scenario,you <br /> would need to notch the wall around the existing water meter(s)to keep them accessible. <br /> Please let us know which option you would like to pursue and we will be able to process your permit. <br /> Thanks, <br /> Sabrina Fandler, P.E. <br /> Associate Engineer I Permit Services <br /> 425.257.7813 13200 Cedar Street, 2"d Floor, Everett,WA 98201 <br /> Hours: Monday—Friday 7:30am-12:OOpm and 1:OOpm-4:OOpm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 4 J� <br />
The URL can be used to link to this page
Your browser does not support the video tag.