Laserfiche WebLink
1/10/2020 'age 1 <br /> City of Everett <br /> 12:43:55P,M <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1608-009 Site Address 2223 TAYLOR DR <br /> Applied 8/9/2016 Applicant REED ROBERT Lot <br /> Approved 11/1/2016 Owner JACOBSON ROBERT L Block <br /> Issued 1/27/2017 Contractor KEARSLEY HOMES INC Tract <br /> Parent Permit No. PW 1609-020 Description SFR REMODEL,REPLACE GARAGE&DECK <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 3/22/2017 3/22/2017 Footing KMK Approval OK to pour <br /> 4/10/2017 4/10/2017 Foundation KMK Approval OK to pour <br /> 4/14/2017 4/14/2017 Footing DWF Approval See notes Patio deck-footings as per plans <br /> 18"diameter-#18 <br /> 24"diameter-#1 <br /> OK for concrete <br /> 5/9/2017 5/9/2017 ShearNailing DWF PartialApproval Sheet S5-1 detail <br /> Shear wall hold down <br /> MST 60-6 straps <br /> Epoxy install by special inspector <br /> Need final letter at Building final <br /> Verified#6 straps to be installed <br /> Kitchen shear walls OK to cover. <br /> 7/21/2017 7/21/2017 ShearNailing KMK Approval 1.Exterior shear OK to cover. <br /> 2.Back deck framing OK. <br /> 3.Roof OK to sheath and roof. <br /> 8/4/2017 8/4/2017 P1bgRoughln SDP Approval <br /> 9/21/2017 9/21/2017 Framing DWF PtAppr-CorrReq See notes Need mechanical rough in. <br /> Partial approval subject to mechanical <br /> rough in. <br /> Sign off before cover. <br /> 9/22/2017 9/22/2017 MechRoughln SDP Approval <br /> 9/22/2017 9/22/2017 Framing DWF PartialApproval Subject to <br /> mechanical rough in <br /> 9/29/2017 9/29/2017 InsulBldg DWF PartialApproval Spray foam in walls. <br /> Provide a copyof insulation certificate at <br /> building final. <br /> R-value of foa. <br /> OK to drywall <br /> 6/29/2018 6/29/2018 GAS 03-FINAL SDP APPROVAL <br /> 6/29/2018 6/29/2018 MECH 06-FINAL SDP APPROVAL OK as noted <br /> 6/29/2018 6/29/2018 PLUMB 06-FINAL SDP APPROVAL OK as noted <br /> 1/15/2019 1/15/2019 BLDG 14-FINAL DWF NOT READY Phone:425-478-6380 <br /> AM inspection requested <br /> (1/15/2019 10:17 AM DWF) <br /> No plans on site <br /> Need public works final before building <br /> inspection final. <br /> 4/22/2019 4/22/2019 PLUMB 06-FINAL SDP APPROVAL PM Inspection requested <br /> 425-478-6380 <br /> (4/22/2019 2:30 PM SDP) <br /> Called out for a sewer repair in the under <br /> slab building sewer.The sewer main has <br /> been replaced and re-routed to connect to <br /> the side sewer on the East side of the house <br /> instead of the North side(water side)of the <br /> house. <br /> INSP12 CRWS M S. <br />