My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2223 TAYLOR DR 2020-06-30
>
Address Records
>
TAYLOR DR
>
2223
>
2223 TAYLOR DR 2020-06-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 1:39:56 PM
Creation date
6/30/2020 1:38:10 PM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2223
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREMANUFACTURED TRUSS SHOWN IS SIMP.'A35'CLIP 8IIII1 <br /> GENERIC.REFER TO ARCH.FOR TOP AND 2x RIDGE BEAM EA RAFTER L <br /> BOTTOM CHORD SLOPE AND CHORD PER PLANS -- <br /> DEPTH.MATCH BLOCKING DEPTH ROOF SHEATHING AND ROOF SHEATHING AND DORMER ROOF SIMP.°A35'CLIP HANGER EA <br /> ACCORDINGLY. -NAILING PER STRUCTURAL NAILING PER STRUCTURAL- ' <br /> NOTES NOTES RAFTER8�PENS --- / \\ _RAFTER INSTALLED W!(12)8dxPj <br /> 1 Yf NAILS(ALT RAFTER SIDES ! <br /> 86 COMMON®4'O.C.INTO PER c"--12 / A \\ TO AVOID NAIL INTERFERENCE) I <br /> BLOCKING U.N.O.IN DIAPHRAGM, 84 0 4°O.C. ROOF SHEATHING ARCH; as <br /> SCHEDULE I ATTIC INTO BLOCKING 1 AND NAILING PER I i/ <br /> �' TRUSSES / STRUCTURAL NOTES <br /> PER FRAMING 2z BLOCKING W/VENT HOLES PEL:\ <br /> j `�`\ r i <br /> 1--- <br /> 12 PLANS ARCH,OR PROVIDE ARCH /L �' SECTION@ <br /> CONNECTION PER SHEAR WALL �g WALL SCHEDULE ROOF RAFTER PER RAFTERS <br /> SCHEDULE(16605'TOE NAILS �y (00iY FRAMING PLAN BIRD'S LTP48811'O.C. I <br /> ALL OTHER LOCATIONS) '.f 'I MOUTH CUL'FOR FLAT <br /> Ba�4'oc ' BEARING <br /> DORMER ROOF ROOF SHEATHING <br /> CONT.Tx DER RIM - RAFTERS BEYOND 7 <br /> \\. <br /> ' P� PER STRUCTURAL <br /> r Btl 4"O.C. SIMP."H1"CUP AT EACH NAILED W/(3)16d FACE i (8)iBd COMMON CONT.1 I 2x RIDGE r-MANUFACTURED <br /> / NOTES C9 <br /> TRUSS TO DBL TOP PLATE NAILS(8'-0"MIN.CONI Ii/ t■' BEAM PER PLANS ROOF TRUSSES / <br /> I MEMBER 0 ROOF 1 <br /> SIMP. CLIP AT EACH NAILS EA.KING STUD ,--_ ! EXISTING FRAMING ed COMMON NAI <br /> CONT.2x Df#2 RIM 1 11'Sy� CORNERS) ` � RAFTER TO DBL TOP PLATE TO RIDGE BEAM 19 2x TRIMMER POST W/ \ ' 4"O.C. 11" <br /> NAILED W/MIN.(2)180 \� ALTERNATE SIDES (2)2x KING STUDS (CONTRACTOR RESPONSIBLE • �y <br /> FACE NAILS(13,17 MIN. DBL TOP PLATE �!_ COMMON/NAILS 6' FOR TEMPORARY <br /> 3TRCONSSHORING <br /> TR CONSTRUCTION) <br /> ,/ .:'0• zOz <br /> CONT.MEMBER OVERHANG BUILT-UP TRIPLE CONSTRUCTION) I \ W <br /> OVERHANG PER PLAN 2x6 DBL TOP O.C.STAGGERED& I _ <br /> ROOF CORNERS) PER PLAN PLATE STUD COLUMN iii ALTERNATE SIDES .� <br /> pl _ `t <br /> SHEATH GABLE • <br /> SHEAR WALL PER PLAN SHEAR WALL PER PLAN - — TRUSS TO ROOF <br /> SHEATHED AND NAILED PER SHEATHED AND NAILED PER 2x8 DR/20R HF#2 <br /> SHEAR WALL SCHEDULE(SWI . 2t DF#2 OR HFI/2 SHEAR WALL SCHEDULE(SWI IF� STUDS 016'O.0 !'� - —_--- / Tti <br /> IF NOT NOTED AS SHEAR STUDS 18°0.0. NOT NOTED AS SHEAR WALL) •n' <br /> WALL) STRAP BEAM TO ADJACENT PLATE W/ <br /> SECTION( SIMR'MSTC88"STRAP <br /> i;k k '•- <br /> NEWBEAM/COLLECTOR_ `, •P" <br /> • POST ELEMENT PER PLANS —_j'F, n <br /> ®ATTIC TRUSS TO WALL ® RAFTER TO WALL 0 DORMER RIDGE BEAM AND POST — � I <br /> I <br /> �yl� <br /> I <br /> 2i COMPRESSION TRUSS PLATE i 0712'7/1& <br /> SHEATH AND NAIL WALL <br /> / FIELD BUILT TRUSSES:2x8 OFR TOP CHORDS 0 2.1.O.C.W/24 DF#2 -EXISTING ASSUMED PER'SW4" }B' •♦ <br /> BOTTOM COLLAR TIES 0 24°O.C.HANG TO EXISTING RIDGE BEAM W/ DOUBLE TOP PLATE O 1 G <br /> SIMP.°A25'CUPAND BEAR ON NEW WALL NAIL COLLAR TIE TO TOP ! �� ,• <br /> OVERFRAME AS REQUIRED FOR / CHORDS WI(4)10d COMMON FACE NAILS EACH INTERFACE <br /> SIMP.RTP4"E 11'0.Q EXISTING <br /> I <br /> PROPER ROOF SLOPES d e. IXIS7ING RIM 1 -2403 DRO/BHEAR WALL(DOUBLE �A f; <br /> I STUDS 0 END OF SHEAR WALL) t <br /> EXISTING RIDGE BEAM TO <br /> /-REMAIN UNCHANGED MSTC88 STRAP CENTERED 0 END OF PSL - <br /> 2x8 DF#2 RAFTERS Q 24'0.C. '� FLOOR SHEATHING <br /> SI8TEREO TO EXI671N0 FRAMING AND - PER STRUCTURAL <br /> BIRD'S MOUTH RAFTER FOR FLUSH "' -SPANNING TO NEW BEARING WALL. <br /> SEARING AND PROVIDE BLOCKING IN EA HANG TO EXISTING RIDGE BEAM W/ ___ I NOTES 1 <br /> BAY BEARING WALLS.SECURE ALL % SIMP."A35.CLIP , _ { j SIMP.°HDUS"HOLD DOWN PER PLANS <br /> TRUSSES OR RAFTERS TO BEARING WALLS , .'" iENDS OF <br /> • <br /> W/SIMP. CUPS _ EXISTING RAFTERS \ IXISTING EXTTo BR WAD SCREWS SHEAR WALLS ATTACHED TO <br /> BE DOUBLE 24 OFR STUD WI SUPPLIED SDS <br /> I SCREWS <br /> - TO BE REMOVED j' ASSUMED END OF EXISTING FLOOR FRAMING ••I. LEDGER PER DETAIL 9/83 <br /> Robert Rood <br /> NEW DORMER!i /�/ k' EXISTING RAFTERS NEW PSL BEAM PER <br /> AND VERIFY EXISTING 2x <br /> 1' FRAMING PLANS DF#2 RIM GRADE AS !•' NEW DECK FRAMING TO ARCHITECT <br /> !' - j EXISTING BEARING 2c4 DF#2 KING STUD REQUIRED FOR JOISTI '�� REPLACE EXISTING DECK PER <br /> /' WALL TO BE REMOVED NANILED TO CONNECTION WI. <br /> PLANS <br /> • CEILING JOISTS PER TRIMMER W/168 _' _ <br /> /;i STRUCTURAL NOTES-) COMMON 03"0.0. I - ..�_�;•. r—Ir—Ir—n—Tr <br /> 2x12 DF#2 LEDGER SECURED W/MP. NEW OPENING IN t F V <br /> 4 If-- Y'0x5"SOS SCREWS(@B"O.C. EXISTING WALL EXISTING WALL � �� - <br /> STAGGERED.HANG RAFTERS WI SIMP. *1:1 ....II <br /> . .CUP STUDS TO REMAIN �_} <br /> CONT.HEADER PER PLANS 4x8 DS DF#2 LEDGER SECURED TO I I 'j NEW BEARING/SHEAR PONY WALL 4308 emGevud <br /> EXISTING RIM W/SIMP.Y•°8 I ( .. Ehmu,wrNrglm eat03 <br /> TRIMMER STUD : i (DOUBLE STUD ALIGNED W/ABOVE) <br /> %/, '^FRAMING PLANS 1 SDS x 3'SCREWS 04.O.C. <br /> NEW BEARING WALL 2x \ I STAGGERED.HANG JOISTS WI I �jI I _SHEATH AND NAIL PONY <br /> ' /' -_._STUDS 18"O.C.(HEADERS—�— ! SIMP'LUS28° j I it •WALL PER'SW4' P'�'� <br /> .7 peot <br /> :1^. PER PLANS) — <br /> 2x8 DF#2 JOISTS E 1W I —°h"0 F15541335 ALL THREAD ANCHOR ROD W WwwwoodWAMYetwom <br /> O.C. -1_ II SIMPSON ALL THREAD <br /> COUPLER AS REQUIRED <br /> 0 SECTION @ NEW ROOF FRAMING FOR SOUTH BATHROOM DORMER ADDITION a PSL @ EXISTING WALL SIMPSON%.••••24 II r hit. FINISHED GRADE <br /> ANCHOR BOLT 0 HDU6 - <br /> I e \ PT.2c4 MUD SILL PLATE W/ <br /> \\_Yx'O AB.MIN.P EMBED W/3'x 3"x)7 <br /> EXISTING N i THICK WASHER AT 18°0.C.&17 <br /> FOUNDATION FROM END OF EACH MEMBER. W <br /> `CRAWL P a \ (U.N.O.IN SHEAR WALL SCHEDULE) <br /> I .GRADE Z ` 0 <br /> (z)#a7oPBARS LU / N <br /> > CRAWLBBAKACE BARS(°0 0 CA <br /> Ip .ILL -q� II < <br /> FREE-DRAINING GRANULAR <br /> MATERIAL 17 WIDE MIN.TO et O <br /> WITHIN 12'OF FINISHED GRADE J <br /> #4 VERTICAL BARS 170.C. 4°a-I OR PROVIDE MIRA-DRAIN TYPE Z Q r <br /> CENTERED(ALT HOOKS IN FTG) DRAINAGE MAT SYSTEM <br /> LAP BARS MIN.2-1'IF REQUIRED I,° (WATERPROOFING BY OTHERS} • <br /> N <br /> a 4°PERFORATED FOOTING DRAIN COL <br /> . COC7 W <br /> - SURROUND W/GRAVEL O (NJ <br /> \ <br /> • <br /> Q N W <br /> ' +. <br /> I (2)CONT S <br /> #a BARS,.d' <br /> EQ. ..S...." EQ. d STRUCTURAL <br /> 1,-0, DETAILS 2 <br /> STEP FOOTING AS GRADE <br /> PERMITS.MAINTAIN A MAXIMUM 35 <br /> DEGREE(FROM HORIZONTAL) <br /> PLANE FROM THE BOTTOM EDGE <br /> OF THE EXISTING FOOTING TOR ' <br /> PER PLANS BOTTOM EDGE OF THE NEW DATE: 07-27-18 <br /> ...1 FOOTING DESIGNED BY: JBL <br /> CHECKED BY: <br /> O <br /> • .,SCALE: AS NOTED <br /> Q SECTION @1 KITCHEN BUMP OUT 7 i PROJECT No: E11+4 <br /> ® SHEET <br /> 4 <br /> r� S4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.