Laserfiche WebLink
. j <br /> x/14. Provide detail/section at the new hallway. Show how this area meets the requirements <br /> of the WSEC for walls, floor and ceiling. (See #1 above for one-hour fire-resistant <br /> requirements) <br /> 15. Provide detail of post/beam connection and post to footing connection at deck <br /> construction. Footings shall rest on undisturbed soil not less than 12 inches below the <br /> finished grade. Show on plans. <br /> Please prepare a response letter showing where each item in this <br /> correction letter is addressed on the plan set. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email: iheilman©ci.everett.wa.us <br /> \\) <br /> i 5/ <br /> S.\1Common\Clerical\JHeilman\CW)000(-)OO(COR LTR (6524 TYEE RD).doc '� <br />