Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA I1EM COVER SHEET 1 0 <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with AECOM for Proposed Action Originating Department Public Works <br /> Design and Construction Consent Contact Person Souheil Nasr <br /> Support Services for the Water Action Phone Number (425)257-7210 <br /> Filtration Plant Operations First Reading FOR AGENDA OF April 29, 2015 <br /> Building Seismic Retrofit Second Reading <br /> Project. Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President 0 C <br /> Location Preceding Action Attachments Department(s) Approval • <br /> Everett Water Filter None Two signed Professional Public Works <br /> Plant Services Agreements. <br /> Amount Budgeted $1,000,000 <br /> Expenditure Required $185,400 Account Number(s): UP 3600-1 <br /> Budget Remaining $814,600 • <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> In 2012,the"Water Filter Plant Operations Building Seismic Retrofit" project was submitted for Hazard <br /> Mitigation Grant Program(HMGP)which funds projects that reduce the adverse impacts and losses caused <br /> by natural hazard events such as earthquakes on critical assets. The subject project will ensure continued <br /> Water Filter Plant operation in the event of a major earthquake (475 year return period). <br /> The Washington State Military Department awarded the City a grant in the amount of$786,488 ($674,133 <br /> Federal and$112,355 State funds). A local match of$200,407 is required. <br /> The City went through its Consultant Roster and selected AECOM to provide the design and construction <br /> support services for the project. Total expenditure requested to provide the design and construction support <br /> services is $185,400. Budget remaining is$814,600. <br /> RECOMMENDATION: <br /> Authorize the Mayor or his Designee to sign the Professional Services Agreement with AECOM for the <br /> Design and Construction Support Services for the Water Filtration Plant Operations Building Seismic <br /> Retrofit project in the amount of$185,400. <br /> 67 <br />