Laserfiche WebLink
0 <br /> AC0M AECOM 206 438 2700 tel <br /> ``��,,// Century Square 866 495 1422 fax <br /> 1501 4th Avenue,Suite 1400 <br /> Seattle,WA 98101-1616 <br /> www.aecom.com <br /> April 15, 2015 <br /> Souheil Nasr, P.E. <br /> Principal Engineer <br /> City of Everett, Public Works <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Subject: Water Filtration Plant Operations Building Seismic Retrofit Project <br /> Dear Souheil, <br /> The attached scope, budget, and project schedule describe pre-design, design, bid support, <br /> and construction period services for seismic retrofits needed at the Water Filtration Plant <br /> Operations Building. In 2012, a building assessment was completed which helped the City <br /> identify areas of concern within the Operations Building and secure project funding through <br /> FEMA and the State of Washington Military Department Hazard Mitigation Grant Program. <br /> This project will include pre-design to evaluate-and prioritize problems identified in the 2012 <br /> report and develop alternatives to resolve seismic concerns. The pre-design will conclude <br /> with a 15%design memorandum, drawings, cost estimates, and a plan for final design, <br /> permitting, and implementation. Design will include submittals at 50%, 90%(permit phase), <br /> and 100% (issued for construction). Bidding support and services during construction are <br /> �. included in this scope of work. <br /> AECOM is committed to working with the City to develop the most suitable designs for <br /> implementation. We are excited for this opportunity to submit this proposal for this important <br /> project. Please do not hesitate to contact Carla Talich at 206.438.2125 if you have any <br /> questions or require further information. <br /> Best Regards, <br /> AECOM <br /> elf/tht 4./ta• <br /> Carla Talich, PE Robert Ward, PE <br /> Project Manager Senior Vice President <br /> 79 <br />