My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/05/06 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/05/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:56:21 AM
Creation date
7/1/2020 10:52:12 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> OVERPASS AGREEMENT <br /> BNSF File No. <br /> Road/Avenue Overpass <br /> U.S. D.O.T. No. <br /> This Agreement ("Agreement"), is executed to be effective as of this da of <br /> 200_ ("Effective Date"), by and between BNSF RAILWAY COMPANY co, ela are corporation <br /> ("BNSF"),and the CITY OF Everett, a political subdivision of the State of Wa a gton g-ncy"). <br /> RECITALS: \ <br /> WHEREAS, BNSF owns and operates a line of railroad in and throug k City__count • ` <br /> State of — •� ''�, <br /> WHEREAS, the existing Road/Avenue Overp-s will ilea- manedosed, vacated and <br /> removed upon completion of construction and the placing)a ervice of 'D' ew‘r Road/Avenue <br /> Overpass, such closure, vacation and removal to be evi•eaced by a seaa ete agreement between the <br /> parties hereto; <br /> NOW, THEREFORE, in consideration of the mu al cove is an•l=• -e- Tents of the parties contained <br /> herein,the receipt and sufficiency of which -11eteby ackno dger,iri►- •arties agree as follows: <br /> • <br /> ARTICLE!—SCOPE OF WORK <br /> 1. The term "Project" rse• herein d c udes ant and all work related to the construction of the <br /> proposed Ro-•r'ven•-,,Overp-\\(hereinafter referred to as the "Structure"), more <br /> particularly described on t t�Exhibit : &tache. `L1 -to and incorporated herein, including, but not limited <br /> to, any and 1 ch nges to t[ epho c-, e e,9 as�h, si•nal and electrical lines and appurtenances, temporary . <br /> and per la e• t k wor`- en- JO, gra3nng' alterations to or new construction of drainage facilities, <br /> prelimi a and co struction en!fi eering d contract preparation. During construction of the Structure, <br /> vehicu a , traffic will b- exclu•e•__r•�r,`he use of Road/Avenue between <br /> Road/1 nue and 'oad/•venue and rail traffic will be temporarily relocated on a shoofly in <br /> the existing. ;- ROM venue Right of Way. Additionally, temporary controls during construction <br /> wok <br /> must be i 'comp lance with Se tion 8A-5, "Traffic Controls During Construction and Maintenance" of the <br /> Uniform Traffic Control Device Manual, U.S. Department of Transportation. <br /> ['OPTIONAL -1E FOLLOWING PROVISIONS IF NECESSARY: <br /> Due to the high volume of pedestrian traffic on Road/Avenue, a temporary pedestrian <br /> crossing with automated warning devices will be installed and removed upon completion of construction <br /> of the new grade separation structure. Such pedestrian crossing will be governed by a separate <br /> agreement between the parties hereto. <br /> Agency must also install and maintain fencing which will direct pedestrians around the construction site. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.