My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/05/06 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/05/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:56:21 AM
Creation date
7/1/2020 10:52:12 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> the cost estimates set forth in said Exhibit D. In such event, the revised cost estimates will become a part <br /> of this Agreement as though originally set forth herein. Any item of work incidental to the items listed on <br /> Exhibit D not specifically mentioned therein may be included as a part of this Agreement upon written <br /> approval of Agency, which approval will not be unreasonably withheld. Construction of the Project must <br /> include the following railroad work by BNSF: <br /> (a) Procurement of materials, equipment and supplies necessary for the railroad work; <br /> (b) Preliminary engineering, design, and contract preparation; <br /> (c) Furnishing of flagging services during construction of the Project as required and set forth in <br /> further detail on Exhibit C, attached to this Agreement and made a part hereof; <br /> (d) Furnishing engineering and inspection as required in connection vtito UM co struction of the <br /> Project; i 2 <br /> (e) Removal of the existing Avenue at-grade'crossing .1')o re la al of the <br /> automatic warning devices, and obliteration of the crossi•• bet e=I tii`- rails 41 u two feet <br /> outside thereof['OPTIONAL, insert this provision if =;P_ sa ,1 1 <br /> (f) Providing a contract project coordinator, at A encys .expe s- to set`v as a project <br /> manager for the Project; and <br /> i / <br /> (g) Construction of a temporary pedestrian a • .•e crossing .and installation of automatic <br /> warning devices r***OPTIONAL, inser this p'a,0, ;ion if ne• sary]. <br /> \ • <br /> 3. BNSF will do all railroad work set forth i..A icle Ili,�ection �. ••IF'on an actual cost basis, when <br /> BNSF, in its sole discretion, determines it is:es filed by itsll1•o afire-a-nts to perform such work with its • <br /> own employees working under app'Tcable ao -eVk.baraaini •lq_ eem-w g•.\> <br /> 4. Agency agrees to reimburs-. o.4SF for •r.`of an emergency nature caused by Agency or <br /> Agency's contractor in connection with'`'d''roject w et BNSF deems is reasonably necessary for the <br /> immediate restoration of railro.•-operati• 4r for the • •otection of persons or BNSF property. Such <br /> work may be performed by o y S`A+ Iii gut priof .•.•roval of Agency and Agency agrees to fully reimburse <br /> BNSF for all such emerge c�vniork. •., ``� <br /> 5. BaSF y chargaf geiter'for iasu /nce expenses, including self-insurance expenses, when <br /> such exge es cover the cost otEmpl• ers Liability (including, without limitation, liability under the <br /> Federaployer's Liabilit Act t connection with the construction of the Project. Such charges will be <br /> conside d part of the ac at cos' • IN.'roject, regardless of the nature or amount of ultimate liability for <br /> injury, os or dea Jo :-F 'employees, if any. <br /> 6. During the construe1C1of the Project, BNSF will send Agency progressive invoices detailing the <br /> costs of the railroad work •e ormed by BNSF under this Agreement. Agency must reimburse BNSF for <br /> completed forcedaccoun`: ark within thirty (30) days of the date of the invoice for such work. Upon <br /> completion of the `rope , BNSF will send Agency a detailed invoice of final costs, segregated as to labor <br /> and materials for each item in the recapitulation shown on Exhibit D. Pursuant to this section and Article <br /> IV, Section 7 herein, Agency must pay the final invoice within ninety (90) days of the date of the final <br /> invoice. BNSF will assess a finance charge of .033% per day (12% per annum) on any unpaid sums or <br /> other charges due under this Agreement which are past its credit terms. The finance charge continues to <br /> accrue daily until the date payment is received by BNSF, not the date payment is made or the date <br /> postmarked on the payment. Finance charges will be assessed on delinquent sums and other charges <br /> as of the end of the month and will be reduced by amounts in dispute and any unposted payments <br /> received by the month's end. Finance charges will be noted on invoices sent to Agency under this <br /> section. <br /> Form 0105 Rev.06/01/05 <br /> 2f <br />
The URL can be used to link to this page
Your browser does not support the video tag.