My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/05/06 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/05/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 10:56:21 AM
Creation date
7/1/2020 10:52:12 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> (h) Design and construction of a permanent paved roadway across the Structure along the <br /> track to be used for access to BNSF property located <br /> of <br /> (i) Installation and maintenance of an 8-ft. high fence and/or concrete combination (throw <br /> fence)on the outside barrier of the Structure; <br /> (j) Job site cleanup including removal of all construction materials, concrete debris, surplus <br /> soil, refuse, contaminated soils, asphalt debris, litter and other waste materials to the <br /> satisfaction of BNSF; <br /> (k) [add <br /> additional items as necessary] <br /> • <br /> 7. Agency must apply and maintain said D.O.T. Crossing number oil conspicuous <br /> location on the Structure. <br /> 8. Agency's Work must be performed by Agency or Agency' Contract• +1, anner ill at will not <br /> endanger or interfere with the safe and timely operations of BNSF and <br /> 9. For any future inspection or maintenance, eit i • a e • c• erwise, performed by <br /> subcontractors on behalf of the Agency, Agency shall r- • e c► 'con e rs to execute the C <br /> documents. Prior to performing any future maintenance wit its own �on[nRgency shall: comply <br /> with all of BNSF's applicable safety rules and regulati• equire an /Agency employee performing <br /> maintenance to complete the safety trainin• prog-=iii, at the laNSF's Internet Website <br /> "contractororientation.com°; notify BNSF when, = to t ' +t•uire•Icaa s of exhibit C, a flagger is required to be present; procure, and have approw-d -gement Department, Railroad - <br /> Protective Liability insurance. <br /> 'rt0. Agency must require its contr-csoi s) to +rei' BNSF' (greadma t1'at least thirty (30) calendar <br /> days prior to requesting a BNSF fla;pi in acc•....i.ce with the requirements of Exhibit C attached <br /> hereto: -Additionally, Agency must req• contrac •r(s to notify BNSF's Manager of Public Projects <br /> thirty(30)calendar days prior t•,co 11! eric+ ;v ork on B' -_ properV or near BNSF tracks. <br /> 11. Agency'or its co r tor(s) ii ii sub'ii +•ur (4) copies of•any plans (including two sets of <br /> calculations i nglish Uiiit-) for i•[r•peg:.• sho- g, falsework or cribbing to be used over, under, or <br /> adjacent • Ji! y acks la N_ Ma *i r of Public Projects for approval. The shoring, falsework or <br /> cribbin• t!:c-d by Agency's ctor si@l comply with the BNSF Bridge Requirements set forth on <br /> Exhibi I` and all applicable rztoo em-qt promulgated by state and federal agencies, departments, <br /> commis-•nsand • • :tiv-Io�r�fC-� <br /> 12. ust include tQ e following provisions in any contract with its contractor(srperfoririing <br /> work on said Project: <br /> (a) ,;�1-i o-ractor is placed on notice that fiber optic, communication and other cable <br /> -- and systems (collectively, the "Lines") owned by various telecommunications <br /> companies may be buried on BNSF's property or right-of-way. The locations of these <br /> Lines have been included on the plans based on information from the <br /> telecommunications companies. The contractor will be responsible for contacting <br /> BNSF's Engineering Representative ( ), BNSF's Signal Representative <br /> ( ), and the telecommunications companies and notifying <br /> them of any work that may damage these Lines or facilities and/or interfere with their <br /> service. The contractor must also mark all Lines shown on the plans or marked in <br /> the field in order to verify their locations. The contractor must also use all reasonable <br /> methods when working in the BNSF right-of-way or on BNSF property to determine if <br /> any other Lines(fiber optic, cable, communication or otherwise)may exist. <br /> Form 0105 Rev.06/01/05 <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.