My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 6/29/2020
>
Contracts
>
Capital Contract
>
Stellar J Corporation 6/29/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 12:26:50 PM
Creation date
7/1/2020 12:26:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
6/29/2020
Council Approval Date
6/17/2020
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$911,212.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run Date: 5/1/2020 City of Everett-Public Works Department Cutoff Date: 4/24/2020 <br /> Time: 10:04 AM Contract Estimate Voucher <br /> Project: 359 For Work Order#3647 <br /> J Estimate#14 Contractor: STELLAR J CORPORATION <br /> Process Water Pump Station 1363 DOWN RIVER DRIVE <br /> WO 3647 BID:$914,753.00 WOODLAND,WA 98674 <br /> TOTAL BID:$989,697.70 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Trench Safety Systems LF 30.00 50.00 30.0000 30.0000 0.0000 900.00 900.00 0.00 <br /> 0002 Pump Station Completion LS 822,000.00 1.00 1.0000 0.9995 0.0005 822,000.00 821,551.19 448.81 <br /> 0003 Force Account FA 1.00 15,000.00 12,059.5100 12,059.5100 0.0000 12,059.51 12,059.51 0.00 <br /> 0004 Furnish Automatic Duplex Priming System LS 38,725.00 1.00 1.0000 1.0000 0.0000 38,725.00 38,725.00 0.00 <br /> 0005 Power Quality Metering for Load Monitoring LS 24,956.00 1.00 1.0000 1.0000 0.0000 24,956.00 24,956.00 0.00 <br /> 0006 Installation of New Pump Priming System LS 12,572.00 1.00 1.0000 0.0000 1.0000 12,572.00 0.00 12,572.00 <br /> Work Order Totals: 911,212.51 898,191.70 13,020.81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.