Laserfiche WebLink
Exhibit C-Scope of Work <br /> Exhibit D-Compensation and Expenses <br /> TENW Project Name: Everett EPIC Prepared by: MJR <br /> TENW Project No.: 2020-130 Date: 6/9/2020 <br /> TOTALS <br /> HOURS/ Principal Design Manger Sr.Project Mgr Sr.Design Engr Project Engr Tech Support <br /> TASK DOLLARS $245.00 $205.00 $165.00 $150.00 $125.00 $110.00 <br /> 1.Perform trip generation analysis of proportional shares of traffic demand of <br /> new bridge connection into Master Plan area. 14 6 8 0 0 <br /> Prepare brief summary memo of findings/conclusions. $ 2,670.00 $1,470.00 $0.00 $0.00 $1,200,00 $0.00 $0.00 <br /> 2.Traffic Operational Impact Analysis of 20 Study Intersections and Completior <br /> of Section 14 of SEPA Checklist. 54 10 20 16 8 <br /> Evaluate three scenarios(Existing,Future Baseline,Wth Project) $ 8,330.00 $2,450.00 $0.00 $0.00 $3,000.00 $2,000.00 $880.00 <br /> 3.Optional Task-Build Synclxo Model 30 2 2 6 20 <br /> $ 4,220.00 $490.00 $0.00 $330.00 $900.00 $2,500.00 $0.00 <br /> 4.Management Reserve(On-Call Services) <br /> __ $ 4,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> TOTALS 98 18 0 2 34 36 8 <br /> $19,220.00 $4,410.00 $0.00 $330.00 $5,100.00 $4,500.00 $880.00 <br /> TENW Labor Total(with Optional Task) $19,220.00 <br /> TENW Labor Total(Tasks 1,2,and 4 Only) $ 15,000.00 <br /> Subconsultants <br /> $0.00 <br /> Subtotal= $0.00 <br /> Markup on Sub $0.00 10% <br /> Reimbursables= $100.00 <br /> TOTAL AMOUNT $19,320.00 <br />