My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE 2020-07-01
>
Address Records
>
19TH AVE SE
>
11229
>
SILVER LAKE TOWNHOMES WHOLE SITE
>
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE 2020-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 2:20:56 PM
Creation date
7/1/2020 2:00:27 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11229
Tenant Name
SILVER LAKE TOWNHOMES WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 OCT 201?. <br /> PUBLIC WORKS PERMIT —Mate Applied: 4/27/2017 <br /> City of Everett Public Works Department Public Works Permit#: PW1704 048 <br /> 3200 Cedar Street Parent Permit#: <br /> Everett,WA 98201 Planning Reference#: SMA16-008 <br /> (425)257-8810 Public Works Fee: $5572.02 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SILVER LAKE TOWNHOMES Peter Anderson <br /> 19528 VENTURA BOULEVARD, SUITE 573 3918 SW Orchard St. <br /> TARZANA, CA, 91356 SEATTLE, WA, 98136 <br /> PHONE: PHONE: 2069495828 <br /> TAX PARCEL ID#: 00574700101903 SITE ADDRESS: 11229 19TH AVE SE <br /> DESCRIPTION: SITE WORK FOR 16 NEW TOWNHOMES <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 10/16/2017 <br /> and SWPPP dated 8/23/2017.Approved plans and reports must remain on job-site at all times. <br /> 5.This permit shall comply with seasonal wet-weather limitations per the attached excerpt from the Ecology Manual. <br /> 6. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction to set up a pre- <br /> construction consultation.All inspections must be formally requested. See the attached handout for phone number and online instructions <br /> to Request an Inspection. <br /> 7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Departmt.Woillshall <br /> be scheduled 3-4 weeks in advance. r - ;••-- ; r i <br /> 8.As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the P pns{ctefi krrE,ity,Dest�anti <br /> Construction Standards and Specifications for Development prior to final approval/close out of th 6CmF <br /> 9. On-site water main will be staked within an easement to the City. The easement documentatio-will t th&city prior to <br /> issuance of permits and must be recorded by the project team with a copy of the recorded document submitted'to"-the City#rior to final <br /> approval/close out of the permit. -= -� ;- <br /> 10. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvemeNs shall be submitted to the; it.;/ <br /> prior to final approval/close out of the permit. <br /> r•.�a <br /> 11.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastture shall be submitted to AIR City <br /> prior to final approval/close out of the permit. <br /> 12.A Landscape Inspection is required by the Planning Department prior to final by the Public Wcviieeot�t9r} ct the Plannim <br /> DDepartment at 425-257-2273 to schedule the inspection. r;1 g c..., •r•.a r " <br /> 13.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. eilraheeiiiVaibtOilje to request p-final <br /> for this permit when all items have been completed. r••-}N.) f:%-° <br /> t�r <br /> Public Works Permit Fee Breakdown: a f <br /> Paving (20,604SF) $103.20 <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate(2658CY) $260.00 <br /> PW Plan Review $1,669.61 <br /> PW Site Inspection $3,339.21 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> —ed„,ilfA <br /> /07,0/00,/� expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) t for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. M <br /> FINAL INSPECTION Date , \() \ 1 <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> F/GS <br />
The URL can be used to link to this page
Your browser does not support the video tag.