My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE Geotech Report 2022-10-25
>
Address Records
>
19TH AVE SE
>
11229
>
SILVER LAKE TOWNHOMES WHOLE SITE
>
Geotech Report
>
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:34:24 PM
Creation date
7/1/2020 2:20:55 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11229
Tenant Name
SILVER LAKE TOWNHOMES WHOLE SITE
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Proposed Development: 11229 - 19th Avenue SE, Everett, WA <br /> September 16, 2016 <br /> P:oe D <br /> I 2ro 8" JJ <br /> i <br /> Yew Ste&Pqe <br /> .0••to tft t 4'le 2'wide Xtrong.Steel Ring <br /> vd"firer weeded to p+pe sleeve <br /> Onven Steep Pipe jar71 or <br /> Beveled End to aid insar1tor <br /> The quality of a pin pile foundation is dependent, in part, on the experience and professionalism <br /> of the installation company. We recommend that a company with experienced personnel be <br /> selected to install the piles. <br /> Lateral Forces-The capacity of pin pipes to resist lateral loads is very limited and should not be <br /> used in design. Therefore, lateral forces from wind or seismic loading should be resisted by the <br /> passive earth pressures acting against the pile caps and below-grade walls or from battered piles <br /> (batter no steeper than 3(H):12(V)). Friction at the base of pile-supported concrete grade beam <br /> should be ignored in the design calculations. Passive resistance values may be determined using <br /> an equivalent fluid weight of 250 pounds per cubic foot(pcf). These values include a safety factor <br /> of about 1.5 assuming that properly compacted granular fill will be placed adjacent to and <br /> surrounding the pile caps and grade beams. <br /> Grade Beam/Pile Cap Embedment- We recommend that the grade beams and pile caps located <br /> around the perimeter of the structure be embedded such that the bottom of the grade beam is at <br /> least 16 inches below the adjacent ground surface. <br /> Estimated Pile Length —The subsurface conditions at the site will likely vary substantially across <br /> the site. Based on the soil conditions at the site and our experience in the project area, for planning <br /> and cost estimating purposes, we estimate that pile length may be about 15 feet. <br /> Pile Installation Monitoring: The quality of a pipe pile foundation is dependent, in part, on the <br /> experience and professionalism of the installation company. We recommend that a company with <br /> personnel experienced in the successful installation of pipe piles be selected to install the piles. <br /> 16-210 11229 19th Ave SE Rpt Page 9 PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.