My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE Geotech Report 2022-10-25
>
Address Records
>
19TH AVE SE
>
11229
>
SILVER LAKE TOWNHOMES WHOLE SITE
>
Geotech Report
>
11229 19TH AVE SE SILVER LAKE TOWNHOMES WHOLE SITE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:34:24 PM
Creation date
7/1/2020 2:20:55 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11229
Tenant Name
SILVER LAKE TOWNHOMES WHOLE SITE
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Proposed Development: 11229 - 19th Avenue SE, Everett, WA <br /> September 16, 2016 <br /> recommendations. Additionally, we should also be notified to review the applicability of our <br /> recommendations if there are any changes in the project scope. <br /> The scope of our work does not include services related to construction safety precautions. Our <br /> recommendations are not intended to direct the contractors' methods, techniques, sequences or <br /> procedures,except as specifically described in our report for consideration in design. Additionally, <br /> the scope of our services specifically excludes the assessment of environmental characteristics, <br /> particularly those involving hazardous substances. We are not mold consultants nor are our <br /> recommendations to be interpreted as being preventative of mold development. A mold specialist <br /> should be consulted for all mold-related issues. <br /> This report has been prepared for planning and design purposes for specific application to the <br /> proposed project in accordance with the generally accepted standards of local practice at the time <br /> this report was written. No warranty, express or implied, is made. <br /> This report may be used only by the client and for the purposes stated, within a reasonable time <br /> from its issuance. Land use, site conditions (both off and on-site), or other factors including <br /> advances in our understanding of applied science, may change over time and could materially <br /> affect our findings. Therefore, this report should not be relied upon after 24 months from its <br /> issuance. PanGEO should be notified if the project is delayed by more than 24 months from the <br /> date of this report so that we may review the applicability of our conclusions considering the time <br /> lapse. <br /> It is the client's responsibility to see that all parties to this project, including the designer, <br /> contractor,subcontractors,etc.,are made aware of this report in its entirety. The use of information <br /> contained in this report for bidding purposes should be done at the contractor's option and risk. <br /> Any party other than the client who wishes to use this report shall notify PanGEO of such intended <br /> use and for permission to copy this report. Based on the intended use of the report, PanGEO may <br /> require that additional work be performed and that an updated report be reissued. Noncompliance <br /> with any of these requirements will release PanGEO from any liability resulting from the use this <br /> report. <br /> 16-210 11229 19th Ave SE Rpt Page 17 PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.