My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
703 110TH PL SE 2020-07-01
>
Address Records
>
110TH PL SE
>
703
>
703 110TH PL SE 2020-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2020 3:02:34 PM
Creation date
7/1/2020 3:01:55 PM
Metadata
Fields
Template:
Address Document
Street Name
110TH PL SE
Street Number
703
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47-h1(p <br /> PUBLIC <br /> Date: 10125'12046 <br /> •RKS rERMIT Public Works Permit#: PW1610-037 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: C1607-016 <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> YAKOVLEV GENNADIY&YAKOVLEVA WICKHAM ROD <br /> 703 110TH PL SE <br /> EVERETT WA 98208 <br /> PHONE: PHONE: 4252522789 <br /> TAX PARCEL ID# 00397000005209 SITE ADDRESS: 703 110TH PL SE <br /> SITE WORK FOR ADU <br /> PTN LOT 52 OF EXST PLAT <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 10/25/2016. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7403 <br /> prior to starting construction and with other inspection requests. To schedule an [�I <br /> inspection on the voicemail inspection line, call 425-257-8881. <br /> 6. Install erosion control measures per City of Everett Standards for small parcels and Cip <br /> remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto <br /> roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Driveway for ADU shall be installed per City of Everett Standards, specifically <br /> Drawing#307, 308, or 309, whichever is most appropriate with the existing topography. O <br /> 10. Driveway must be an approved paved surface. Apron must be concrete. Driveway <br /> width must be a minimum of 10'and maximum of 20'. (15'width shown on plans is DEC ' 20/6 <br /> acceptable). C <br /> Public Works Permit Fee Breakdown: Aerm/t Ser I J7•7 C <br /> Driveway $25.00 es QI <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> Aelit1/14 &ILL to—Rs—20/6 causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> Approved for Construction Date remove same upon not •m the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date : r91 no <br /> Approved as Constructed Signature of Applicant . Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> WE— <br />
The URL can be used to link to this page
Your browser does not support the video tag.