My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2020-07-02
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2020-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 10:05:16 AM
Creation date
7/2/2020 9:46:18 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Notes
WO 3591-02
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.77. PROJECT ROUTING FROM DEVELOPMENT TECHNICIAN <br /> (Public Works / Permit Services) <br /> Routed Date: 3/23/2017 <br /> Permit#: PW1703-047 <br /> PROJECT ADDRESS: 505 E MARINE VIEW DR <br /> DESCRIPTION OF WORK: RIVERSIDE RD AND 8TH ST IMPROVMENTS: Construction of 8th Street with storm and utility <br /> infrastructure mains and stubs to service interior lot developments. Construction of public access trails along 8th Street and Riverside <br /> Rd,within driveway entrances to interior lots.Additions to exisitng stormwater infrastructure to accommodate a 100-year storm event. <br /> Trenching in existing Riverside Rd pavement for installation of new stormwater infrastructure. <br /> 43 ,J <br /> PLANNING REFERENCE#'s(if applicable): t2�'p�( 6 <br /> PRE-APP MEETING #: Ci 1 ,(O �Q a4°- vb 41A, <br /> ye <br /> LAND USE PROJECT#: Q< `) <br /> 62:c <br /> PUBLIC WORKS REVIEWER: I el'l�"!(A. �l6l 5'(,c0� <br /> REQUEST: Please review the attached material for your area of conc•rn and return any comments <br /> and/or redlines to the Public Works Reviewer listed abov-. 11040 <br /> ROUTED TO: �/,M�, <br /> ❑ Stormwater/Drainage: Jane Zimmerman/Arnie Roshak/Erik Emerson _ /dr 7+�,`^ r <br /> Traffic:(�� Bric - John Wisdom/ Corey Hert/Steve Sawyer/Tim Mille � �q� '12af't <br /> ❑ Water: Jim Spooner/Tim Markham/Rich Hefti/Shane Cavanah "A <br /> ltriElA ,/ <br /> . -��h /hamtra ani /3' <br /> ❑ Sewer: Brian Doolan/Dave Voigt/Arnie Roshak/Mark Sadler ,y t Ow an/a d.1/ <br /> ❑ Planning: Teresa Weldon/Grace Pollard/ Kelsey Heyd/Kembra Landry/Steve Ingalsbe/Joh`S Jimersonl <br /> 7h ; <br /> ❑ Building: Meg Haley/Steve Miller/James Bronder/Jeff Heilman/Tony Lee <br /> ROUTED MATERIALS: <br /> Plans 0 Original City Comment Letter <br /> ❑ Traffic Control Plan 0 Original City Plan Markups <br /> ❑ Drainage Report 0 Original City Drainage Report Markups <br /> ❑ Geotechnical Report 0 SEPA Determination (for reference) <br /> ❑ Wetland Report 0 Preliminary Short Plat Approval (for reference) <br /> ❑ Arborist Report 0 Other: <br /> COMMENTS FROM REVIEWER: (Please make comments below and/or redlines on plans) <br /> STATUS: <br /> ❑ Approved <br /> ❑ Approved as Modified <br /> ❑ Revisions Required, See Comments <br /> ❑ Review Not Required <br /> COMMENTS: � ;>> ;" �. ,�; %. _ L , „ _, <br /> Jy (, <br /> REVISED 12/07/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.