Laserfiche WebLink
2.1.3 Element 3: Control Flow Rates <br /> Flow rates shall be controlled using existing Stormwater Quality Pond 2 prior to discharging to <br /> existing outfalls. All runoff prior to and after final site stabilization shall be directed to this pond. <br /> Will you construct stormwater retention and/or detention facilities? <br /> ❑ Yes® No <br /> Will you use permanent infiltration ponds or other low impact development(example: rain <br /> gardens, bio-retention, porous pavement)to control flow during construction? <br /> ❑ Yes® No <br /> List and describe BMPs: existing Stormwater Quality Pond 2 <br /> Installation Schedules: Prior to earthmoving activity. <br /> Inspection and Maintenance plan: Wet Season: Weekly and after heavy rainfall, Dry Season: <br /> Monthly and after rainfall. <br /> Responsible Staff: TBD <br /> Page 18 <br />