Laserfiche WebLink
4.4.2 Isolation Valve 9 <br /> 4.5 Post-Recording of Stormwater Drainage Easement 9 <br /> 4.5.1 City Maintenance and Operation 9 <br /> 4.5.2 Stormwater Utility Surcharge - 9 <br /> 4.53 Stormwater System Capacity 10 <br /> 5 SANITARY SEWER SYSTEM 10 <br /> 0 5.1 Sanitary Sewer Easement 10 <br /> 5.2 Infrastructure Transfer 10 <br /> 5.2.1 Definition of Transferred Sewer Infrastructure 10 <br /> 5.2.2 Date of Transfer 10 <br /> 5.2.3 Transferred Sewer Infrastructure Free and Clear 10 <br /> 5.2.4 Transfer of Warranties 10 <br /> 5.2.5 No Other Warranties 11 <br /> 5.2.6 Bill of Sale 11 <br /> 5.3 Easements for Connection to East Marine View Drive 11 <br /> 5.4 Lot 8 11 <br /> 53 Post-Recording of Sanitary Sewer Easement: City Maintenance and <br /> Operation 11 <br /> 6 ROADWAYS RIGHT OF WAY EASEMENT 11 <br /> 7 TIMING 11 <br /> 7.1 Overpass Temporary Construction Agreement 11 <br /> 7.2 Benson &Wolken New Public Access Easement 12 <br /> 7.3 Quit Claim Bill of Sale on Bridge 12 <br /> 7.4 Tulalip Waterline Easements 12 <br /> 7.5 Stormwater Drainage Easement 12 <br /> 7.6 Sanitary Sewer Easement 12 <br /> 7.7 Roadways Right of Way Easement 13 <br /> 0 8 RIVERSIDE BUSINESS PARK DEVELOPMENT GUIDELINES - - 13 - - <br /> - 8.1 Public Access 13 <br /> 8.2 Modified Guidelines 13 <br /> 83 Future Amendment 13 <br /> K.3ir <br /> 0000003 <br />