My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD 2020-09-18
>
Address Records
>
RIVERSIDE RD
>
607
>
607 RIVERSIDE RD 2020-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 2:41:10 PM
Creation date
7/2/2020 11:14:34 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Notes
WO 3591-02
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP C153: Material Delivery, Storage and Containment <br /> Prevents, reduces, or eliminates the discharge of pollutants from material delivery and storage to the <br /> stormwater system or watercourses by minimizing the storage of hazardous materials onsite, storing materials <br /> in a designated area, and installing secondary containment. <br /> Additional applicable source control BMPs per the Activity Worksheet of the 2010 City of Everett Stormwater <br /> Management Manual include: <br /> A3.2— Concrete Pouring, Concrete Cutting, and Asphalt Application at Temporary Sites <br /> A6.1 — Dust Control at Disturbed Land Areas and Unpaved Roadways and Parking Lots <br /> A7.11 — Maintenance of Private Utility Corridors and Facilities <br /> A7.12— Maintenance of Stormwater Drainage and Treatment Facilities <br /> More detailed information on these BMPs can be found in the SWPPP included in Appendix B. The Activity <br /> Worksheet can also be found in Appendix B of this report. <br /> 6. Special Reports and/or Studies <br /> The following Special reports and studies prepared for this project and adjacent project are included in <br /> Appendix C. As the Riverside Business Park has been in development since year 2000, several reports and <br /> amendments to those reports have been prepared. <br /> Stormwater Site Plan (Comprehensive Hydraulics Report), April 2000, by Reid Middletown <br /> This report documents the design of the original 2000 development. Documentation for the existing storm <br /> drain conveyance, pumps, and water quality ponds are included. <br /> Amendment 1, October 19, 2016, by Reid Middleton <br /> This amendment to the original April 2000 Stormwater Site plan proposes modifications to the pumped storm <br /> drain system in Riverside Road (N-S) to accommodate some flow discharge from the interior Riverside <br /> Business Park lots. <br /> Amendment 2, March 8, 2017, by KPFF <br /> This amendment to the original April 2000 Stormwater Site plan and Amendment 1 proposes modifications to <br /> the pumped storm drain system in Riverside Road (N-S)to accommodate the 100-year event from Riverside <br /> Road (N-S), Riverside Road (E-W), and Eighth Street. <br /> Development Guidelines, February 13, 2014, by Landau Associates <br /> This document consolidates the restrictions, covenants, and pertinent statutes the project must comply with <br /> during and after construction. <br /> Soil and Groundwater Management Plan, March 15, 2017, by Landau Associates <br /> This document provides recommendations for handling contaminated groundwater and soil if encountered on site. <br /> Riverside Business Park—Public Access Trails and Roadway Improvements <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.