Laserfiche WebLink
Table of Contents <br /> 1 Project Information 4 <br /> 1.1 Existing Conditions 4 <br /> 1.2 Proposed Construction Activities 4 <br /> 2 Construction Stormwater Best Management Practices (BMPs) 6 <br /> 2.1 The 13 Elements 6 <br /> 2.1.1 Element 1: Preserve Vegetation/ Mark Clearing Limits 6 <br /> 2.1.2 Element 2: Establish Construction Access 7 <br /> 2.1.3 Element 3: Control Flow Rates 8 <br /> 2.1.4 Element 4: Install Sediment Controls 9 <br /> 2.1.5 Element 5: Stabilize Soils 10 <br /> 2.1.6 Element 6: Protect Slopes 11 <br /> 2.1.7 Element 7: Protect Drain Inlets 12 <br /> 2.1.8 Element 8: Stabilize Channels and Outlets 13 <br /> 2.1.9 Element 9: Control Pollutants 14 <br /> 2.1.10 Element 10: Control Dewatering 16 <br /> 2.1.11 Element 11: Maintain BMPs 17 <br /> 2.1.12 Element 12: Manage the Project 18 <br /> 2.1.13 Element 13: Protect Low Impact Development(LID) BMPs 21 <br /> 3 Pollution Prevention Team 22 <br /> 4 Monitoring and Sampling Requirements 23 <br /> 4.1 Site Inspection 23 <br /> 4.2 Stormwater Quality Sampling 23 <br /> 4.2.1 Turbidity Sampling 23 <br /> 4.2.2 pH Sampling 25 <br /> 5 Discharges to 303(d)or Total Maximum Daily Load (TMDL)Waterbodies 26 <br /> 5.1 303(d) Listed Waterbodies 26 <br /> 5.2 TMDL Waterbodies 26 <br /> 6 Reporting and Record Keeping 27 <br /> 6.1 Record Keeping 27 <br /> 6.1.1 Site Log Book 27 <br /> 6.1.2 Records Retention 27 <br /> 6.1.3 Updating the SWPPP 27 <br /> 6.2 Reporting 28 <br /> 6.2.1 Discharge Monitoring Reports 28 <br /> 6.2.2 Notification of Noncompliance 28 <br /> Page II. <br />