Laserfiche WebLink
2.1.2 Element 2: Establish Construction Access <br /> Construction access shall be stabilized by maintaining existing asphalt drives, paving-new <br /> asphalt treated base construction access routes, or by providing new stabilized construction <br /> entrances. Dust shall be kept to a minimum by watering and temporary site stabilization. <br /> All sediment tracked offsite by construction activity shall be swept immediately. Flushing <br /> sediment from city streets into the storm drainage system is not acceptable. <br /> List and describe BMPs: C105— Stabilized Construction Entrance/Exit, C107— Construction <br /> Road/Parking Area Stabilization, C140 — Dust Control <br /> Installation Schedules: Prior to earthmoving activity and maintained throughout construction. <br /> Inspection and Maintenance plan: See Appendix B. <br /> Responsible Staff: TBD <br /> Page 17 <br />