Laserfiche WebLink
2.1.4 Element 4: Install Sediment Controls <br /> BMPs including silt fence, catch basin protection, and existing Stormwater Quality Pond 2 will <br /> minimize sediment discharge from the site. <br /> Each phase of construction activity shall utilize these BMPs to direct all site runoff to collection <br /> points where runoff can be conveyed to the existing Stormwater Quality Pond 2 prior to <br /> discharge to existing outfalls. <br /> These elements will be upgraded if necessary to account for site conditions and rainfall. <br /> List and describe BMPs: C220—Storm Drain Inlet Protection, C233—Silt Fence, existing <br /> Stormwater Quality Pond 2 <br /> Installation Schedules: Prior to earthmoving activity and maintained throughout construction. <br /> Inspection and Maintenance plan: Wet Season: Weekly and after heavy rainfall, Dry Season: <br /> Monthly and after rainfall. See Appendix B. <br /> Responsible Staff: TBD <br /> Page 19 <br />