Laserfiche WebLink
2.1.8 Element 8: Stabilize Channels and Outlets <br /> Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br /> adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br /> conveyance systems. <br /> All runoff on site will be directed to existing stormwater infrastructure that discharges to existing <br /> Stormwater Quality Pond 2. All existing and proposed outlets will be inspected and upgraded <br /> where necessary to suit the phase of construction and weather conditions. Final outlet <br /> stabilization will be according to the site civil construction plans. <br /> List and describe BMPs: C122— Nets and Blankets, C209—Outlet Protection <br /> Installation Schedules: Prior to earthmoving activity and maintained throughout construction <br /> Inspection and Maintenance plan: Wet Season: Weekly and after heavy rainfall, Dry Season: <br /> Monthly and after rainfall. See Appendix B. <br /> Responsible Staff: TBD <br /> Page 113 <br />