My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2408 VIEWCREST AVE 2020-07-02
>
Address Records
>
VIEWCREST AVE
>
2408
>
2408 VIEWCREST AVE 2020-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 1:47:47 PM
Creation date
7/2/2020 1:47:25 PM
Metadata
Fields
Template:
Address Document
Street Name
VIEWCREST AVE
Street Number
2408
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Le PUBLIG*VORKS PERMIT I IIIIIDateAppfied: 11/18/2019 <br /> City of Everett Permit Services Publicbrks Permit#: PW1911-021 <br /> EVERETT 3200 Cedar Street, 2 0 Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $144.82 (� <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: 1 I�o V 2019 <br /> KALMUS MATTHEW PAEA ANDREW <br /> 2408 VIEW CREST AVE 33043 46TH PL S <br /> EVERETT,WA,98203 AUBURN,WA,98001 <br /> PHONE: PHONE:9515706337 <br /> TAX PARCEL ID#:00567900300803 SITE ADDRESS:2408 VIEWCREST AVE <br /> DESCRIPTION: REPLACE DRIVEWAY SECTION AND APRON <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 11/18/2019.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upcii comp9 t on of <br /> the project prior to final approval of the permit. '—`"-- ' `" '`'" ,1-7, '�a <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadwaro F1 c";a.`? . .;_ <br /> 8. Protect all existingunderground utilities duringconstruction. g"' ',id, �`-'"=' �`° <br /> g s 'm. _il'-ri .i-t• <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced imperY1 u "s'ii faces l be managed <br /> on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or ease xsent n4 the <br /> improvements located therein. 11---, <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. quest a final inspection onlirtg by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests for this permit+.1;en all items have been com ted. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the own '"s expense if the City ever regires <br /> use of the right-of-way for municipal purposes. , f b , <br /> .. *, LArar •ra <br /> Public Works Permit Fee Breakdown: r'�'lti r 5 "='`—' ' r-,r. n IS <br /> ,3---,LA <br /> L <br /> Driveway/Concrete Apron $25.00 _a t r. <br /> Paving(140SF) $45.00 h <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee $34.82 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> // / the City of Everett from any and all claims for damages,costs,expenses,or <br /> .�- , -!�a causes of action that may arise because of installation and maintenance of <br /> ,'ppOF for Construction(Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same noon notice from the City and to replace public <br /> / i cc.)z...........„ 12 1 'q property damaged t reb <br /> FINAL INSPECTION Date I.: ��� T71 <br /> Approved as Constructed (PW Inspector) Signature of Ap licant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.