Laserfiche WebLink
Geotechnical Engineering Evaluation NGA File No. 1033518 <br /> Larsen Property Garage May 8,2018 <br /> Everett,Washington Page 11 <br /> pressure distribution equivalent to that exerted by a fluid with a density of 40 pcf for yielding (active <br /> condition) walls, and 60 pcf for non-yielding (at-rest condition) walls. The uphill eastern side of the <br /> garage structure is intended to perform as a debris wall,and we recommend that this portion of the garage <br /> wall be designed for an active pressure of 80 pcf. <br /> These recommended lateral earth pressures are for a drained granular backfill and are based on the <br /> assumption of a maximum 2H:1V backfill inclinations and do not account for surcharge loads. <br /> Additional lateral earthpressures should be considered for surcharge loads acting adjacent tosubsurface <br /> walls and within a distance equal to the subsurface height of the wall. This would include the effects of <br /> surcharges such as traffic loads,floor slab and foundation loads,or other surface loads. We are available <br /> to provide consultation regarding additional loads on retaining walls during final design,if needed. <br /> The lateral pressures on walls may be resisted by friction between the foundation and subgrade soil, and <br /> by passive resistance acting on the below-grade portion of the foundation. Recommendations for <br /> frictional and passive resistance to lateral loads are presented in the Foundations subsection of this <br /> report. <br /> All wall backfill should be well compacted as outlined in the Structural Fill subsection of this report. <br /> Care should be taken to prevent the buildup of excess lateral.soil pressures,due to over-compaction of the <br /> wall backfill. This can be accomplished by placing wall backfill in thin loose lifts and compacting it with <br /> small,hand-operated compactors within a distance behind the wall equal to at least one-half the height of <br /> the wall. The thickness of the loose lifts should be reduced to accommodate the lower compactive energy <br /> of the hand-operated equipment. The recommended level of compaction should still be maintained. <br /> Permanent drainage systemsshould be installed for retaining walls. Recommendations for these systems <br /> are found in the Subsurface Drainage subsection of this report. We recommend that we be retained to <br /> evaluate the proposed wall drain backfill material and drainage systems. <br /> Structural Fill <br /> General: Fill placed beneath foundations, slabs, pavements, or other settlement-sensitive structures <br /> should be placed as structural fill:' Structural fill, by definition, is placed in accordance with prescribed <br /> methods and standards,and is monitored by an experienced geotechnical professional or soils technician. <br /> Field monitoring procedures would include the performance of a representative number of in-place <br /> density tests to document the attainment of the desired degree of relative compaction. The area to receive <br /> the fill should be suitably prepared as described in the Site Preparation and Grading subsection prior to <br /> beginning fill placement. <br /> NELSON GEOTECHNICAL ASSOCIATES,INC. <br />