My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 50TH ST SW 2020-07-02
>
Address Records
>
50TH ST SW
>
1205
>
1205 50TH ST SW 2020-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 2:05:37 PM
Creation date
7/2/2020 2:04:33 PM
Metadata
Fields
Template:
Address Document
Street Name
50TH ST SW
Street Number
1205
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/10/2020 Page <br /> City of Everett <br /> 1:22:35PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1805-123 Site Address 1205 50TH ST SW <br /> Applied 5/16/2018 Applicant Lot <br /> Approved 5/16/2018 Owner LARSEN DANA Block <br /> Issued 5/16/2018 Contractor SEATOWN ELECTRIC CORP Tract <br /> Parent Permit No. Description 200AMP PANEL,125AMP SUBPANEL,15AMP DISPOSAL CIRC <br /> Notes (7/15/2019 7:58 AM CRB) <br /> SCOPE CHANGED TO: 320AMP SVC UPGRADE/(2)200SMP PANEL CHANGES/(1)15AMP <br /> DEDICATED CIRCUIT FOR DISPOSAL <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 12/7/2018 12/7/2018 PERMIT CRB APPROVAL <br /> EXTENSION <br /> 7/15/2019 7/15/2019 PERMIT CRB APPROVAL SEE NOTES (7/15/2019 7:59 AM CRB) <br /> EXTENSION SCOPE OF WORK CHANGED NEED <br /> MORE TIME <br /> 7/17/2019 7/17/2019 ELEC 05-SERVICE SKB APPROVAL eTRAKiT Inspection 7/16/2019 7:12 AM SEATOWN <br /> Request ELECTRIC CORP(ELEC) <br /> Service inspection for PUD reconnect! <br /> Please call EC Blake 425-286-7163 in AM <br /> to coordinate ETA.MUST be before 2:30 <br /> Contact Name:Blake CHamness <br /> Site Address: 1205 50TH ST SW <br /> Phone:4252867163 <br /> e-Mail:permits@seatownservices.com <br /> (7/17/2019 9:33 AM SKB) <br /> 400 amp meter base with 2 tenant mains <br /> one to garage subpanel complete one to the <br /> house grounding in place panel not installed <br /> yet. <br /> 7/19/2019 7/22/2019 ELEC 09-FINAL SKB APPRVD-PERN eTRAKiT Inspection 7/18/2019 7:35 AM SEATOWN <br /> Request ELECTRIC CORP(ELEC) <br /> The HO works 10 min away so he would <br /> like to know the window of the inspection <br /> the morning off and a half hour heads up so <br /> he can head from work.If that doesn't work <br /> please call HO to get better date. <br /> Contact Name:Ty Larsen <br /> Site Address: 1205 50TH ST SW <br /> Phone:2063673776 <br /> e-Mail:permits@seatownservices.com <br /> 7/19/2019 7/19/2019 ADMIN USE AKH APPROVAL <br /> ONLY** <br /> INSP12 CsiAn <br />
The URL can be used to link to this page
Your browser does not support the video tag.