Laserfiche WebLink
PUBLINORKS PERMIT Date Applied: 3/25/2019 <br /> /1114111111111 City of Everett Permit Services <br /> 3200 Cedar Street, 2"d Floor <br /> Public Works Permit#: PW1903-051 <br /> Associated Bldg Permit#: C1902-005 <br /> Everett,WA 98201 Planning Reference#: SUB14-002 <br /> (425) 257-8810 Public Works Fee: $65.00 <br /> 04 APR 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> POLYGON WLH LLC PANI ALAN <br /> 11624 SE 5TH ST SUITE 100 <br /> BELLEVUE, WA, 98005 <br /> PHONE: 4255867700 PHONE: <br /> TAX PARCEL ID#: SITE ADDRESS: 4526 RIVERFRONT BLVD <br /> DESCRIPTION: NEW SFR-LOT 380 <br /> PLAN #3581C LOT 380 <br /> OVERLOOK AT RIVERFRONT DEVELOPMENT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at https://pw.everettwa.gov <br /> to formally request all required inspections. Flyers are provided at permit issuance with instructions on how to request an <br /> inspection online. <br /> 6. Install any erosion control measures as determined by the Public Works Inspector, such as silt fence, straw bales, <br /> swales, or erosion blankets. <br /> 7. Connect side sewer per City Standard#'s 601 through 604. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for pedestrian <br /> travel. <br /> 10. Public Works Construction shall be done per approved plan dated 3/25/2019. (Copy attached) <br /> 11. Construct foundation only until Plat is final. <br /> Public Works Permit Fee Breakdown: <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 C � U L_ <br /> Driveway $25.00 e .r � <br /> APR 0 II 2019 <br /> CITY OF FVERETT <br /> Perrin Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> <4.11)1,4t& g4tifik <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> ,015 j expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. ,/� <br /> FINAL INSPECTION Date 141/ t <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> FIGS <br />