Laserfiche WebLink
E V E R E T T <br /> WASHINGTON PUBLIC WORKS REVIEW WORKSHEET <br /> PROJECT ADDRESS: 4603 RIVERFRONT BLVD _(pT3t0 Permit#: C1906-004 <br /> TENANT: OVERLOOK AT RIVERFRONT ew I90 6-63,G <br /> DESCRIPTION OF WORK: NEW SFR/2015 IRC-RB1811-001 <br /> PW Reviewer to select all that apply below: <br /> Utility Permits (Note:Permit Technicians to Create Utility Permit for Sewer, Water, Fire, and Irrigation, as selected below) <br /> SANITARY SEWER: DOMESTIC WATER SERVICE: (Attach Calculation&Cost Est.) <br /> i(New Connection to main plus I connections to building 0 New Connection, Size -0 Per Cost Estimate <br /> ❑Alteration M Meter Only, Size 3/411 -0 Per Cost Estimate <br /> ❑ Repair El Water System Development Fee Total:$ 9,95 0_0 <br /> o Cap-off, quantity I81 Sewer System Development Fee Total:$5;121.°A <br /> ❑ Reconnection to stub 0 Water Service Line(behind meter), Size <br /> ❑ Backwater Valve ❑ Backflow Prevention(Outside Building): 0 RPBA or 0 DCVA <br /> ❑ NOT REQUIRED 0 NOT REQUIRED <br /> Explanation/Utility Permit#: Explanation/Utility Permit#: <br /> IRRIGATION SERVICE: (Not Including Cost Estimates) FIRE SERVICE: (Attach Cost Estimate/Request for Reference) <br /> ❑ New Connection, Size 0 New Connection, Size -0 Per Cost Estimate <br /> ❑ Meter Only, Size 0 3/"Detect Meter Only,Service Size <br /> ❑Water System Development Fee Total:$ ❑ Backflow Prevention (Outside Building): 0 DCDA <br /> ❑ Backflow Prevention (Outside Building): 0 DCVA 14 NOT REQUIRED <br /> M NOT REQUIRED Explanation/Utility Permit#: <br /> Explanation/Utility Permit#: <br /> WATER DEPARTMENT COST ESTIMATE NEEDED-(/f yes, PW Reviewer to send cost estimate request to Water Department) <br /> ❑Yes, Quantity ,See attached for reference. <br /> '1sNOT REQUIRED <br /> Plumbing Permits (Note:Permit Technicians to add all items selected below to Plumbing Permit-for items inside building only) <br /> ❑ Backflow Prevention(Inside Building): 0 DCVA(for Domestic service) 0 RPBA(for Domestic service) 0 DCDA(for Fire service) <br /> Nti NOT REQUIRED <br /> Building Permits (Note:Permit Technicians to add all items selected below to associated Building Permit) <br /> STORMWATER SYSTEM DEVELOPMENT FEES: TRAFFIC MITIGATION FEES: <br /> g'YES, Stormwater Total:$ 622.00 ❑YES,Traffic Mitigation Total: $ <br /> ❑ Roof Only Fee on Bldg Permit(ground hard surfaces fee on PW Permit) 0 See Attached for calc ations credit <br /> '2 All Hard Surface Fees to be added to Permit# C1906-00i/ tiNOT REQUIRED-a�, M <br /> ❑ See Attached Spreadsheet for calculations/credit <br /> ❑ NOT REQUIRED 18891 ott (t2 �61b NPI 6l3 (1/01765-64/2 <br /> Additional Checklists: <br /> ADDRESS LETTER REQUIRED? (If yes(new assigned address), print out Address Letter from TRAKiT Print Menu and include) <br /> JE(YES-TYPE: SFR 0 DUPLEX 0 ADU 0 INFILL DWELLING 0 MULTI-FAMILY 0 COMMERCIAL <br /> 14 See Attached Letter,2 copies(Permit Techs to issue one copy to applicant with permits,scan one copy to Jeffrey Marks) <br /> TB Digital copy attached to permit record, Permit# PtuPR06-O3 <br /> 0 Saved to Address Folder in Development Tech File <br /> ❑ NOT REQUIRED <br /> FIRE SPRINKLERS REQUIRED? <br /> ❑YES-Type <br /> `SNOT REQUIRED <br /> Reason: rl gg.C406, GUf n i 3.50 (Jr F71 <br /> DPUBLIC WORKS PERMIT REQUIRED? <br /> YES, Permit#PW I906-036 <br /> 1rStormwater NPDES Tab Completed in TRAKiT DADA Tab Completed in TRAKiT 1Inspections Added in TRAKiT <br /> ❑ NOT REQUIRED <br /> Worksheet Completed By: SC ��J "� Date: d/g/Z09 <br /> Worksheet Checked By: Date: <br /> REVISED 4/24/2019 <br />