Laserfiche WebLink
i, <br /> GEODESIGN_ FIELD REPORT <br /> 1 of 3 <br /> Project Name: Everett River Front-Simpson Report 149 <br /> GeoDesign #: Polygon-127-03 Date: 8/5/2019 I. <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> • <br /> Randy Allen(City of Everett) 1 Michelle Dittman(Polygon) Weather: Sunny, 70's • <br /> e Ron Bowen(Polygon) Arrival/Departure: 1130/1230 <br /> Distribution: <br /> Kyler Meek(Polygon) <br /> Stephen Farnan(Polygon) Prepared By: Aubrey Hodgins <br /> © Site Plan(s) • <br /> © Density Test Summary Signature. <br /> 0 Installation Records El Other Reviewed By //o ,,, :. r ,„r, <br /> PURPOSE of VISIT: GeoDesign representative, Aubrey Hodgins, was on-site part time at the request of Craig with DDS to <br /> observe foundation subgrade for Lots 307 and 308. <br /> Lots 307 and 308: <br /> Today, GeoDesign noted that DDS had completed excavation of the foundation and crawl space area for Lots 307 and 308. <br /> We noted that the exposed foundation subgrade generally consisted of a gray silty SAND with gravel that could be probed <br /> less than 2 inches using a 1/2 inch diameter soil probe. No over-excavation was necessary for Lot 307 or Lot 308. <br /> Relative compaction of the exposed foundation subgrade was tested using a Troxler Moisture-Density gauge; in-place <br /> density tests indicated that the exposed material had been generally compacted to 95%to 97% of its maximum dry density <br /> as determined by a Modified Proctor analysis. <br /> It is our opinion that the exposed foundation subgrade observed today is currently suitable for support of the intended <br /> structure. A summary of our observations can be found in the attached Figure 1. The contractor was notified of our <br /> observations prior to our departure from the site. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 981 33 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />